Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP1 Teleconference June 14 2005Luca Taffarello The status report of the AURIGA detector Luca Taffarello (INFN Sezione di Padova ) Special tanks to L. Conti.

Similar presentations


Presentation on theme: "WP1 Teleconference June 14 2005Luca Taffarello The status report of the AURIGA detector Luca Taffarello (INFN Sezione di Padova ) Special tanks to L. Conti."— Presentation transcript:

1 WP1 Teleconference June 14 2005Luca Taffarello The status report of the AURIGA detector Luca Taffarello (INFN Sezione di Padova ) Special tanks to L. Conti and G. Vedovato

2 WP1 Teleconference June 14 2005Luca Taffarello Summary of the talk: New detector set-up First Results, calibration and thermal behaviour BUT evidence of noise peaks External excitation to identify the input ports to avoid the noise (mechanical excitation @ low frequencies) Strategy to overcome the disturbances Definition of epoch vetoes in A.D. througt thresold identification New dampers and pneumatic isolation system @ low frequencies Result achieve 1.Good data in nigth and week end (2° Dec 2004-18° May 2005) 2.Very stable and gaussian behaviour (from 19 May 2005)

3 WP1 Teleconference June 14 2005Luca Taffarello new mechanical suspensions: attenuation > 360 dB at 1 kHzFEM modelled new capacitive transducer: two-modes (1 mechanical+1 electrical)optimized mass new amplifier: double stage SQUID 200  energy resolution new data analysis: C++ object oriented codeframe data format Expected target AURIGA II run with 1999-2003 upgrades

4 WP1 Teleconference June 14 2005Luca Taffarello Evidence of spurious peaks in the bandwidth Setting @ T = 4.5K = experimental. data = simulation immediatly is started a diagnostic phase to address the spurious features in the noise spectra Best quiet period December 2003

5 WP1 Teleconference June 14 2005Luca Taffarello The thermal behaviour of the modes is estimates by the measurement of the real part of the input impedence to the SQUID a 4.5 K Not evident lost of charge T= 4.5 K E bias=7.5 MV/m  ‚   =865.68 Hz ‚ =914.14 Hz  =955.63 Hz This is thermal First step: Calibration of the 3 sensitives modes

6 WP1 Teleconference June 14 2005Luca Taffarello 2 Step: THE MECHANICAL TRANSFER FUNCTION VERY IMPORTANT not evident excitation with mechanical and-or electromagnetic actuators  ‚   mechanical mode near the switch ‚Electrome- chanical modes   Mechanical modes of the charge plates

7 WP1 Teleconference June 14 2005Luca Taffarello Complete control of the internal sources of noise (Note: one-sided spectra !) December 2004 after the first up-grading detector up the rubber

8 WP1 Teleconference June 14 2005Luca Taffarello Strategy to cope the spurious peaks  Identification of noise sources: noise hunting  Definition of the possible hardware solutions: 2 steps 1.Rubber dissipation layer below the cryostat (roll-off frequency 8-10 Hz Q=2) 2.Active-air mount (Vibraplane KS) automatic leveling/heigth control low vertical natural frequency and orizontal isolation 1-2 Hz internal damping Q=2 and broad load range) Very important parameter the Q factor to avoid other nolinear-coupling where the seismic power is higher and the movement of the cryostat can generate dangerous mechanical stress in the detector  Decision to maintain on air the detector because from the analysis data is possible to understand more what is wrong and to control directly the efficiency of the new set-up  Definition of epoch vetoes to obtain time period of data workable

9 WP1 Teleconference June 14 2005Luca Taffarello Noise hunting: 3 step analysis 1.Definition of peaks or band noise sources 2.Identification of noise sensitive peaks out bandwidth 3.Application of epoch vetoes based by crossing thresholds previous defined applied to this out bandwidth peaks

10 WP1 Teleconference June 14 2005Luca Taffarello Analysis of auxiliary channels Spurious peak in bandwidth 894 Hz SQUID output 18-22 Hz Sismometer 8-22 Hz Acc. Inside vacuum chamber 8-22 Hz 4 days friday- monday

11 WP1 Teleconference June 14 2005Luca Taffarello Evidence of connection between external (seismic) activities and bandwidth 1DAY1DAY OUTPUT of SISMOMETER in the cryostat 0-22 Hz sensitive bandwidth Not Possible to determine a correlation between the external disturbances and the response in the sensitive bandwidth Evidence for not-linearity behaviour

12 WP1 Teleconference June 14 2005Luca Taffarello Low frequency mechanical excitation and response in the detector bandwidth 2 example also without electrical field Shaking frequency 18.62 Hz Effect: all the multiple Shaking frequency 16.57 Hz Effect: some cluster with more peaks equidistant 16.57/3 Hz Not possible to reach shaking frequency below 10 Hz the seismic noise is too power

13 WP1 Teleconference June 14 2005Luca Taffarello Sunday - Clean Spectrum 950 Hz 900 Hz SpSp SpSp SpSp SpSp SpSp Sp= spurious One year of data between dec. 03 to dec 04

14 WP1 Teleconference June 14 2005Luca Taffarello Clean/Noisy Spectrum “Normal” Noisy spectrum

15 WP1 Teleconference June 14 2005Luca Taffarello Run 590 (Time-Frequency) from Sat 11h-13/11/04 to Mon 12h-15/11/04 Clean Raw Data Noisy Raw Data Sat Sun Mon Only during the Sunday nigth is possible see the better spectra duty cycle Gaussian and stationary very poor 20 %, evidence of Monday morning effect, Human Activities?

16 WP1 Teleconference June 14 2005Luca Taffarello Run 590 (Time-Frequency) 5 hours F5F5 F5F5 F5F5 F5F5 F1F1 F1F1 F1F1 F1F1 It is possible to define some group of spurious peaks correlated F means Family, during the history different family appear and dissapear

17 WP1 Teleconference June 14 2005Luca Taffarello Run 608 - Vetoes F5 Veto (120 s) 236.95 +/- 0.2 Hz Wide Band Veto Wide Band Spurious F5 F1 Veto (60 s) 241.25 +/- 0.5 Hz F7 Veto (60 s) 1133.2 +/- 2 Hz F1 F7 More clean data, long period good in the nigths and in week-end 4000 s Time-frequency behaviour during normal day

18 WP1 Teleconference June 14 2005Luca Taffarello F5 Veto 236.95+/- 0.2 Hz F5 893.63 Hz F5 Veto

19 WP1 Teleconference June 14 2005Luca Taffarello F5 Threshold veto F5 Ada lck psp plugin @ 236.95+/- 0.2 Hz F5 Veto amplitude

20 WP1 Teleconference June 14 2005Luca Taffarello Previous position Position control feed-back lift used with the liquid helium inside the dewars First hardware up-grade: rubber layer of Sylodamp (Angst Pfister) Starting new run 2 Dec. 2004

21 WP1 Teleconference June 14 2005Luca Taffarello AURIGA Events [no vetoes] SNR Italian Holiday

22 WP1 Teleconference June 14 2005Luca Taffarello AURIGA Events [with vetoes] SNR Is possible to apply the epoch vetoes and the result is a duty cycle 60 %

23 WP1 Teleconference June 14 2005Luca Taffarello AURIGA Events [with vetoes & prob>0.00001] SNR a test of consistency about the shape of the burst

24 WP1 Teleconference June 14 2005Luca Taffarello AURIGA Events [with vetoes & prob>0.00001] Amplitude Good stability of the detector in absolute amplitude

25 WP1 Teleconference June 14 2005Luca Taffarello SNR Distribution (with vetoes) (Simulation/Red) SNR 3 events with SNR >10 during 9 days

26 WP1 Teleconference June 14 2005Luca Taffarello Last hardware up-grade : external suspensions low frequency and with vibrational damping Air springs: effective above1-2 Hz

27 WP1 Teleconference June 14 2005Luca Taffarello Metal-arc welding with liquid helium inside the dewars without bias in the trasducer A kind of “wings” to support Auriga above the center of mass of the cryostat

28 WP1 Teleconference June 14 2005Luca Taffarello Low frequency suspensions installed (May 19 th ) Final configurationFerroconcrete Pillar

29 WP1 Teleconference June 14 2005Luca Taffarello Low frequency suspensions installed (May 19 th ) suspension activation

30 WP1 Teleconference June 14 2005Luca Taffarello Before the up-grade AFTER! Also during the day

31 WP1 Teleconference June 14 2005Luca Taffarello Low frequency suspensions installed (May 19 th ) beforeafter Not so evident and dramatic the isolation effect, but impressive the effect in the data! in the best case 1 order of magnitude in amplitude

32 WP1 Teleconference June 14 2005Luca Taffarello Perfect Gaussian and stationary behaviour, duty cycle > 98%


Download ppt "WP1 Teleconference June 14 2005Luca Taffarello The status report of the AURIGA detector Luca Taffarello (INFN Sezione di Padova ) Special tanks to L. Conti."

Similar presentations


Ads by Google