Download presentation
Presentation is loading. Please wait.
Published byHenry Hubbard Modified over 9 years ago
1
Campbell County Industrial Park Mueller Bldg. 2 Buildings Available Square FootageBuilding 1 – 42,000 Building 2 – 21,000 Acreage11.87 Constructed1973, 1974 Building typeBrick and pre-engineered metal; 4 dock doors; 4 10-ton bridge cranes; clear span Ceiling HeightBuilding 1 – 22’ eave ht, 20’ eave height at eave 26’ ridge ht.; Building 2 – 26’ eave ht, 23’ clear ht at eave 29’ ridge. Mueller Building 220 East Industrial Park Drive, Jacksboro
2
Campbell County Industrial Park Glenoit Mills 191 East Industrial Park Dr. Jacksboro Square FootageBuilding B, D, E, H Total of 120,000 sq. feet Acreage19.87 Constructed1973, 1974 Building typeMetal; 6 dock doors, 4-in floors, 24’ eave height; 28 ridge height; Ceiling HeightB – 24’ eave ht, 27’ ridge ht.; D – 17’ eave, 28’ ridge; E – 17’ eave, 201/2 ridge H – 24’ eave, 28’ ridge Privately owned
3
Ershell Collins Industrial Park I-75, Exit 141 Acreage19.87 Available for development
4
Trakker Building Bank-owned property $883K 32,780 Sq. Ft. 4.81 acres
5
PACA Plant 179 Mine Lane Caryville, Tennessee 37714 AVAILABLE Square Footage60,060 Acreage8.6 Constructed1997 Building typeMetal; 5 loading docks (8x10); Ceiling Height16’ eave; 23 ridge
6
I-75 Industrial Rail Park Norfolk Southern Rail Sites evaluated by TVA
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.