Download presentation
Presentation is loading. Please wait.
Published byMadlyn Sharp Modified over 9 years ago
1
Aviation Logistics Management Information System Overview for Air Stations Portal: http://cgweb.almis.uscg.milhttp://cgweb.almis.uscg.mil Project: http://cgweb.arsc.uscg.mil/almishttp://cgweb.arsc.uscg.mil/almis LCDR Daniel P. Taylor Feb 2002 ALMIS
2
Agenda Why, Who, Where, How, What, When Show production EAL application, help, feedback links Show production DSS application, help, feedback links Show next EAL version Hands-on Decision Support System training Your needs? Timing and Breaks?
3
Why Simplified diagram and explanation at: http://cgweb.arsc.uscg.mil/almis/ppt/almis.ppt Link maintenance and supply systems Do I have parts for upcoming maintenance? Fill gaps / enter data once from source Didn’t that just break last month? Why can’t I enter my blue sheets online? Provide Decisions Support System (DSS) Who needs this night boat flight? What parts should ARSC buy this year? How did other units fix that problem?
4
Who and Where Project Mgr, CWO assistant, GS-12, contractors Development done at ARSC ISD Beta testing at mix of seven Air Stations Working with ACMS and AMMIS mx staff Provides challenge and opportunity Changing B&W TV to Color while watching it Partnering with Aviation Logistics Division Using Cognos tools to get information out of database and into hands of people who can use it
5
How Deliver incrementally So why the flight schedule? New MOE’s, start small, build familiarity New MOE’s “Dual use” of old and new apps where able Keep thin for high dial-up performance Respond to user feedback Consider cost versus value of information Provide ample online help Conduct extensive beta testing Consider training needs for rollout
6
What User-Customizable Portal Virtually integrate aviation information Electronic Aircraft Logbook Source data entry (especially blue sheet) Eliminate redundancies in AMMIS / ACMS Capture unscheduled maintenance Decision Support System Right information, time, place, format… OLAP, reporting, ad-hoc tools from Cognos Same tools as CGINFO (http://cginfo.osc.uscg.mil)http://cginfo.osc.uscg.mil ACMS and AMMIS integration Link maintenance – operations -- supply
7
What – EAL Phase 1 – Flight Schedule, Event Status, Aircraft Status, Planned Flt Hrs Phase 2 – Blue Sheet Phase 3 – Yellow / Pink Sheet (and associated forms) Phase 4 – MPC and Supply Integration Phase 5 – Online MPC Signoff Phase 6 – ACMS Interface Replacement
8
What – DSS Phase 1 – Aviation Inventory Control Point Phase 2 – Reliability Centered Maintenance Phase 3 – Flight Operations Phase 4 – Finance and Procurement Phase 5 – Unit Maintenance Phase 6 – Depot Supply (Buy Model) Phase 7 – Depot Maintenance
9
When EAL Phase 1 in use today Great online help at: http://cgweb.almis.uscg.mil/eal/help/eal_help.htm Everyone should use Flt Sched and Planned Flt Hrs, Event Cancellation Beta units use Event Status and Aircraft Status Phase 2 in use at beta units Fleet-wide rollout after Phase 3 complete Portions will be rolled out sooner DSS in use today Ample online help – starting point: http://cgweb.arsc.uscg.mil/almis/webhelp/dss.htm
10
Questions? This presentation and notes: http://cgweb.arsc.uscg.mil/almis/ppt/010504_AirSta.ppt Contact information LCDR Dan Taylor 252-335-6170 ARSC Customer Support 252-335-6793 Feedback Threaded discussion group http://cgweb.arsc.uscg.mil/almis/forum/ EAL Feedback http://cgweb.almis.uscg.mil/feedback/feedback.asp
11
Dispatch Outcomes and Reasons
12
Portal
13
EAL
16
DSS – Report
17
DSS – PowerPlay (summary)
18
DSS – PowerPlay (drill down)
19
DSS – PowerPlay (chart)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.