Download presentation
Presentation is loading. Please wait.
Published byMelina Ellis Modified over 9 years ago
1
schematic design presentation 2.3.12 School of Business South Hall Renovation
2
the Project Summary Current Schedule Process to Date Schematic Design Completion
3
the Process Stakeholder Interviews Programming Creative Visioning Workshops
4
workshop part 1: What are the needs? What are the trends? In learning environments? In business culture? What is the School of Business vision?
5
active learning
6
blended learning
7
flexibility
8
diffusion
9
sustainability
10
a Hub
11
workshop part 2: Established project goals Set project program requirements Evaluated & tested concept ideas Confirmed design direction
12
the Project Goals community collaboration flexibility identity technology history
13
the Project Program instructional space classrooms seminar rooms computer labs break-out rooms common space commons/cafe project rooms student study/activities office space faculty & staff
14
the Evaluation Stakeholder Interviews LSSU Administration, Faculty & Staff Programming Space Needs Creative Visioning Workshops Community, LSSU & Students LSSU Campus Master Plan Historical Resources Existing Conditions Site, Building & Engineering Systems Project Budget State of Michigan Capital Outlay Request
15
the Schematic Design
16
Site Plan: southeast campus
17
North Elevation: campus view
19
South Elevation: community view
20
Floor Plan: main level
21
Interior Elevation: north entry lobby
22
Interior Elevation: south commons
23
Floor Plan: upper level
24
Interior Elevation: classroom
25
Interior Elevation: seminar rooms
26
Floor Plan: lower level
27
Interior Elevation: project rooms
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.