Kingsclear Consolidated School Parent / Community Meeting November 29, 2010
2
Information Kingsclear Consolidated School was constructed in 1950 Wood frame building comprised of 1350 sq. m. of floor space Situated on a 4.16 acre site Official September 30, 2010 enrolment - 117 ( Enrolment Nov 24 th - 121 ) $288,346 in facility upgrades since 02-03
3
Background April 2009 – PSSC expressed concern regarding the condition of Kingsclear Consolidated School and its ability to accommodate the needs of students and staff. June 2009 – The district recommended a full review of the facility.
4
Background June 2009 – District Education Council recommended to the Minister that an evaluation of program and curriculum needs and the condition of the facility be conducted. Summer 2009 – Consultant engaged to evaluate the facility condition. September, 2009 – Consultant report received.
5
Background November 2, 2009 – Consultant’s report shared with PSSC. February 22, 2010 – PSSC meeting to discuss options for the future of Kingsclear Consolidated School. May 31, 2010 – received letter from PSSC requesting major renovations.
6
Background It was made clear to the District that the community wishes to ensure the future existence of Kingsclear Consolidated School.
7
Background June, 2010 -- District Education Council recommended to the Minister that a full study of the sustainability of Kingsclear Consolidated School in accordance with Policy 409: Multi-Year School Infrastructure Planning be undertaken as a Major Capital Project for 2011-2012.
8
Background September, 2010 – Received revised consultant’s report. Revisions not included in original report: ◦ Elevator essential to meet accessibility requirements. ◦ Recommendation that a structural analysis be completed prior to any major renovation. Typically buildings of this period are seismically deficient. ◦ Programming deficiencies will not be addressed without the incorporation of a new addition. ◦ An addition will reduce already limited parking and hard surface play areas. ◦ Revised costs to reflect above. Renovation increased from $1,990,000 to $3,045,000 Addition increased from $5,950,000 to $6,683,000
9
Background In accordance with Policy 409, outcomes of a sustainability study can include maintaining the status quo, repairing the school or closing the school and placing students elsewhere.
10
Sustainability Study Factors Enrolment Trends – steady or marginal increase Health & Safety – ongoing minor & preventative maintenance Quality of Education Programs & Services Transportation – 78% of students are eligible for bussing Finances – Operational costs comparable to other schools Impact on local community – desire to keep a community-based school Most scenarios would impact other school communities
11
Options Option 1 Maintain status quo with regard to program delivery and facility; physical education and French Immersion continue offsite. Ongoing minor and preventative maintenance will ensure that health and safety issues are addressed.
12
Options Option 2 Maintain status quo with regard to program delivery. Upgrade facility as per ADI Building Assessment ($3,045,000) through the annual Major Capital Improvement Process. This project would become part of the existing major capital improvement process, normally phased over a number of years and prioritized with all other district projects.
13
Summary Numerous options were evaluated. With the exception of Options 1 & 2, all have significant impact on one or more school communities. Enrolment does not support construction of a new facility without affecting other school communities. Cost of the proposed addition is not feasible given proximity to a school which could accommodate the current population with a lower cost addition.
14
What’s next? Report back to District Education Council on December 9, 2010 for further direction. Recommending Option 2.
15
Questions & Comments