Presentation is loading. Please wait.

Presentation is loading. Please wait.

DVES Build or Renovate? On DV Campus or New Site? Location? Do we even need another school?

Similar presentations


Presentation on theme: "DVES Build or Renovate? On DV Campus or New Site? Location? Do we even need another school?"— Presentation transcript:

1 DVES Build or Renovate? On DV Campus or New Site? Location? Do we even need another school?

2 Build or Renovate? Full renovation to make DVES comparable to DDPS and SES approx. $16 million New school approx. $23 million Major drawbacks of renovation include: age of building (1956) probable closure for one full school year still higher operating costs than a new, more efficient building no additional field space

3 Build on DV campus or new site? DV campus is approximately 54 acres 1956 – 1 school (combined HS/MS) 1970 – 2 schools (HS and MS) 1987 – 3 schools (HS, MS and Elementary) 2001 – 4 schools (2 HS, MS and Elem.) + field house Other additions to HS/MS and D.O. District Enrollment 1987 – approx. 1,5002013 – approx. 4,900 Desire to decompress this campus Desire to move elementary away from HS

4 Location for a new school? Search for large tract of land in the DVES attendance area Many hours spent searching Wiese property was not available Our DD vacant lot isn’t applicable Biondo property Central location; on three-lane Favorable initial responses

5 Do we need a new school? 1998 – 4,500 2000 – 4,700 (built DDPS) 2006 – 5,700 2013 – 4,900 We need 4 elementary schools DVES is actually growing!

6 Wiese Property in Matamoras Seller wants land used for a good cause Does NOT include Dervend Circle houses Listed 50 of approx. 64 acres for $1.5 million Great parcel – flat; out of the 100-year flood plain School design will fit beautifully on this parcel Space for a second school if needed in future Will allow us to stay in PlanCon cycle Approx. 8 buses

7 Summary – a Win-Win!!! DVES students get a beautiful new school Matamoras should see property values rise DV sells Biondo property and saves money Milford Township gets large parcel back on rolls Biondo property could generate new jobs in area DV campus gets decompressed District has long-term plan for future growth


Download ppt "DVES Build or Renovate? On DV Campus or New Site? Location? Do we even need another school?"

Similar presentations


Ads by Google