Download presentation
Presentation is loading. Please wait.
Published byJanel Mathews Modified over 9 years ago
1
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014
2
Overhead cranes renovation Existing cranes Presentation of technical specification (scope of supply and main requirements) Planning
3
PR 534 – PR 538 Manuafcturer: SEPA Year: 1976 Capacity: 40 ton Span: 46 m Lifting height: 10 m Possibility to work in «tandem» mode
4
PR 534 – PR 538 Command: cabin sliding along one girder Safe access: only from crane girder Auxiliary hoist: 5 ton
5
Technical specification Technical specification prepared in 2013 (IT-3927) Renovation will be ordered within contract B1422 (frame contract) Any technical requirements can still be changed
6
Scope of supply (as per IT-3927) Replacement of hoist trolley (same capacity)
7
Scope of supply (as per IT-3927) Replacement of long-travel mechanisms (with the exception of wheels)
8
Scope of supply (as per IT-3927) Replacement of all electrical installations (cubicles, cables, feeding line)
9
Scope of supply (as per IT-3927) New control cabin and auxiliary hoist (10 ton)
10
Main requirements - Crane operating area existing 7650!
11
Main requirements – Access to the crane Catwalks will be modified according to the existing standards Access to the cabin: a platform (provided by crane manufacturer) will be installed on the end wall at the same height of the crane cabin cabin platform
12
Main requirements – Control Crane equipped with PLC; possibility to set-up «safety zones» Possibility to operate in tandem mode (only after renovation of both cranes!) Load attached to the hook measured and visible on a display
13
Planning Renovation of each crane: 4 weeks Replacement of electrical feeding line: 3 weeks Recommended period: PR 538 (extension side): end of 2015 PR 534: beginning of 2016 Proper area for the intervention shall be identified
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.