Download presentation
Presentation is loading. Please wait.
Published byRosemary Mitchell Modified over 9 years ago
2
Manage the person and the associated case through the system SA Police Services Investigation Department of Justice Adjudication Department of Welfare Re-unification Business processes cut across departments 78592836 Docket/s Witnesses Exhibits Correctional Services Incarceration Integrated Justice
3
INMATE TRACKING SYSTEM PURPOSE OF THE PROJECT: The purpose of this project is: To investigate and deploy available technologies for purposes of Inmate Tracking as a building block for Detention Management. To enable officials to locate offenders, at all times.
4
INMATE TRACKING SYSTEM IJS INTEGRATION ARCHITECTURE THE TOTAL INTEGRATED SOLUTION NPIS CPS CRIM AFIS A&R The Focus of the Project The Future Concept The Future Concept Sentenced Inmate Module Other Systems in the Process Cycle Awaiting Trial Prisoners (ATPs) Module Links with Major Police Stations & Secure Care Units Inmate Tracking System
5
INMATE TRACKING SYSTEM ENVISAGED SYSTEM OPERATION: The following statement explains how the proposed system is intended to work: Inmate Enters / Exits the Cell, Section, and / or Holding Facility door. This information is sent to the receiver attached to the doorframe, via the transponder fitted on the Wristband, and the receiver will transmit the information to the system database, which will record every inmate’s movement information, within or outside of the prison.
6
INMATE TRACKING SYSTEM BENEFITS OF HAVING THE SYSTEM: Positive Identification / Verification of inmates without manual fingerprint IDs. NB: AFIS technology will play a big roll in this regard. Enhanced Access / Contact of Inmates with: Legal Representatives. Social Workers. Investigating Officials. Probation Officers Ensure effective Court attendance by ATPs. Effective Roll Call. Locate Inmates. Prevent Delays at Courts. Prevent Delays with Investigations. Prevent Person Switching
7
INMATE TRACKING SYSTEM BROAD MILESTONES Compilation of Project Team. Determine PID (Project Initiation Document). Determine requirements and drafting specifications (User Requirements Specification). Publish Tender and Adjudicate. Award Tender. Implementation / Roll out to Pilot Sites – Target date: Year 2002: - Johannesburg Medium A Durban Medium A.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.