1
Autonomous Surface Vehicle ME 435: Stanton Coffey, Pat Gray, Jack Nagle, Sam Riahi, Matt Cline ME 434: Jeff Roper, Brian Skoog, Stephanie McCarthy, Bobby Lee ME Grad: Justin Selfridge ECE: Alex, Bibek, Kouassi, Nimish, Shikha, Khakal, Sushil ECE Grad: Loc ECSU: George Harris, John Hayes
2
Previous Work Electrical box has been rewired and de-cluttered Boat Cart is finished A new motor has been purchased
3
Current Work Blade Shields Blade shields are being ordered from Norva Plastics Original cost $500 Our cost $250 and they will be putting their logo on it
4
Current Work Waterproofing/Camera Mounting There will be a plastic lid to go over the current electrical box and will extend down past any exposed holes All wires will be re-routed up under this lid and nothing will be coming out the side of the electrical box Camera’s will be mounted inside this waterproof shield
5
Current Work Logic Code has been modified so that it no longer knows the order to proceed through the buoys Next steps The code uses a viewing angle of 180º, and we found out that with two camera’s we will have 80º total. So code must be modified to work with a smaller viewing angle Incorporate Yellow buoys as obstacles.
6
Current Work Frame/Pontoons New potential Aluminum perforated hollow square tube framing Can drop 13.9 lbs if necessary ECSU are building our pontoons We expect they will be done in 3 weeks The new pontoons are hollow and have a drain plug The new pontoons are 5 feet long (1 foot longer than our current pontoons)
7
Questions?