Blossom Park Condominiums Update Board of County Commissioners September 15, 2015
2
Presentation Outline Purpose Background Current Status Summary
3
Purpose Purpose Background Current Status Summary
4
Purpose Blossom Park is a condominium complex plagued by serious code violations and crime Previous detailed Board presentations Located in District 4
5
Presentation Outline Purpose Background Current Status Summary
6
Background Originally Days Inn Motel Buildings constructed in 1973 – Concrete block main buildings – Wood structure walkways 6 buildings – 3 stories – 345 units Hotel converted to condominiums in 2003
7
Background C
8
Background Receiver Condo Association was unable to carry out duties Mr. Frank Barber appointed in 2011 Responsible for building upkeep and finances
9
Background Code Enforcement Fines accruing at $3,500 per day Liens filed against condo association Multiple owners significantly complicates demolition
10
Background Code Enforcement Property Maintenance Code violations – All buildings found unsafe and unfit for human habitation – Failing walkways due to water damage – Unsafe stairways, handrails, guardrails
11
Background Conditions Stairs, Landings & Walkways
12
Background Conditions
13
Background Conditions
14
Background Building Safety Repair or replace all landings, stairways Engineering report confirmed all buildings unfit for human occupancy Permitting and inspection for Building G stairwell
15
Background Community Meetings – March 2015 – Four meetings – Building Safety, Health and Family Services, Code Enforcement
16
Background Health and Family Services Relocation Assistance —Eligible households 166 —Participating households 126 Type of assistance Households Cost Temporary housing only 38 $42,322 Permanent housing only 54 $80,678 Permanent and temp. housing 34 $92,057 126 $215,057
17
Presentation Outline Purpose Background Current Status Summary
18
Current Status Receiver Mr. Barber replaced by Mr. Shawn Singletary 120 day appointment According to Receiver utility bills current Group of owners proposes extensive repairs Estimated cost $4.7m to $5.8m (roof, stairs, walkways) Low occupancy
19
Current Status 2015 Occupancy —February 250 residents —September 30-40 residents Building G vacant
20
Current Status Code Enforcement Building G —52 units —Secured stairwells —Chain link entrances —Sheriff’s Office assistance Storage Shed — Secured
21
Current Status
22
Stairs, landings & walkway secured Conditions
23
Current Status Stairs, landings & walkway secured Conditions
24
Current Status Shed secured Conditions
25
Presentation Outline Purpose Background Current Status Summary
26
Summary Receiver is trying to stabilize the complex but unsafe structural conditions still remain Sheriff’s Office has a major presence on site Sheriff’s Office and Code Enforcement will continue to target buildings to remove squatters, secure stairways, and prevent access