MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 MyOcean 2 Project Progress J. Dorandeu – MyOcean2 Project Manager Joel.dorandeu@mercator-ocean.fr
2
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 First year of MyOcean-2: a very busy year A year of operations: MyOcean-2 started with the operation of MyOcean Service version 2 A year of evolutions: Definition and specification of versions 3 and 4 (resp. April 2013 and 2014), implementation of V3 A year of technical work: Design, development and release of V3, R&D, Product quality, Outreach, communication and training A year of important events: MyOcean science days, MyOcean User workshop, internal technical workshops, ECOMF strategic partnership
3
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Major project phases AOR 2 1st Annual Review VARR V3 / PDR V4 VARR V4 AOR 1 2d Annual Review T0+24T0+3T0+12T0+30 PDR V3/V4 T0+6 Specification Spec/Design Design V2 V3 V4
4
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Continuous development in operations April 2012 – April 2013 T0 T0+12 PORPOR PORPOR K O ff AORAOR T0+3 T0+6 PDRPDR PDRPDR PDRPDR EXECEXEC EXECEXEC EXECEXEC Definition of V3 and V4 DWSDWS DWSDWS A cc W S Design of V3 Design of V4 Implementation of V3V4… VaRRVaRR V2 Operations Brussels Cork Barcelona Toulouse Madrid
5
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 A deep internal involvement A improved decision process: – The Executive Committee Bureau (ECB: Marina, Sylvie, Bruce, Alistair, Vincent, Joël): Analyses the issues to be submitted to the Executive Committee -> technical dossiers, preliminary trade-offs Proposes decisions for the Exec. Com. Avoids useless preliminary discussions Some Examples: V3 and V4 requirements, WMS for all products, without authentication, Surface fluxes in reanalyses, Wave parameters, Hindcast definition, Major accounts and Specific Core Products, Merging PUMS and QuIDs, AOR organisation – Work structured and coordinated by cross-cutting work packages – A more mature way of working (within the Executive Committee): Well known decision processes Clear roles and responsibilities
6
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 A deep internal involvement Specific internal work about requirements (for V3 and V4: – In depth analysis of MyOcean status and outputs – Internal consultation at the start of the project (from Kick- Off to June 2012 in Barcelona): significant and relevant feedback from WP leaders – A lot of important decisions taken quite quickly at the Barcelona Executive Committee meeting: user profiles, visualization, Authenticated FTP, archiving, priorities for the CIS, internal interfaces and data flows, etc… – Same process used for evolutions and other decisions (Toulouse and Madrid Exex. Comm. Meetings). Preparation of the MyOcean PDR at T0+3 and T0+6 (while it was T0 + 12 in MyOcean).
7
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Reviews and meetings External reviews (4): – Kick-off April 2012 – Initial PDR (Design review) July 2012 – Final PDR October 2012 – AOR-1: today and tomorrow; POR (Pre-Operation Review), PDR and VaRR (Validation Readiness Review) on 18-19/04/2013 Internal reviews, meetings and workshops: – Executive Committee meetings (4) : Kick-Off, Brussels, April 2012 Barcelona, June 2012 Toulouse, October 2012 Madrid, January 2013 – Internal Reviews (Production Centres and CIS) (2 + 2): Design Workshops: Barcelona, June 2012, Madrid, January 2013 Acceptance workshop: Madrid, January 2013 – Technical meetings (awareness, training, etc) (1): Service Management Product Management Technical meeting wrt to CIS interfaces and tests ECOMF meetings for the preparation of the Copernicus Operational phase
8
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Other important events MyOcean Science Days: November 2012 – Strong participation (120 people, many projects) – Observational systems, Numerical modelling, Data assimilation, validation and user related issues – Outcomes relevant to the next phase but also to the long term operational oceanography R&D roadmap MyOcean User Workshop: April 2013 – Good participation – Plenary and splinter sessions and discussions – Final Round table – Main outcomes: actions to be decided wrt MSFD applications and users, Expected reinforcement of the link with the downstream services (end to end value chain), consolidation for a long term and sustainable Marine Service More frequent or coordinated User workshops ECOMF Strategic partnership: the Nicosia declaration: – defines an ECOMF Strategic Partnership between the “national” institutions that deliver data and predictions to their national or local authorities and ECOMF
9
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Review, meetings and events Summary AORAOR T0+3 T0+6 T0+9 T0 T0+12 PDRPDR PDRPDR VaRRVaRR ExecExec ExecExec ExecExec PDRPDR PORPOR SCDSCD UWSUWS DWSDWS DWSDWS ACCACC Tec WS ExecExec K O ff EC O MF Executive Committee Design Review Operation Review Validation Readiness Review Annual Operation Review Design Workshop Acceptance Workshop Technical Workshop Science Days User Workshop ECOMF strategic Partnership
10
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Other important events External meetings: – With ESA: GSC-DA (2), Sentinel-1 interfaces, OC-SST meeting – With EUMETSAT: 2 programmatic workshops, technical workshops and teleconferences – Project represented at EUROGOOS and ROOS meetings – With REA and GMES projects: coordination of R&D activities – GMES User Forum (presentation of the MyOcean Marine Service) – Participation to many Exhibitions, Symposiums, Workshops and other communication events…
11
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Main results: A user driven Service Current Service Status
12
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 A User driven Service A single user interface: Service Desk and Web Portal A specific project organisation: – Collection of user requirements and engineering into Service Definition: User requirements, user surveys, questionnaires User validation (beta testers), user feedback Traceability of each system functionality to user requirements – A Work Package dedicated to user uptake: Downstream applications and national/regional operational centres – Outreach, communication and training – User workshops Véronique Cédric Marc
13
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 A growing number of users 200920102011 Service v0 2012 2013 Service v1 Service v2 300 Service Level Agreements in April 2011 2000+ SLAs in March 2013 MyOcean2 1000 SLAs in April 2012 2000 users from 1000 organisations 100 new users every month 2000 users from 1000 organisations 100 new users every month
14
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 An international, multi-sector response Users in 88 different countries (26 EU members) A fair repartition in application areas And 67% of users using the core service in more than one sector
15
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 The MyOcean Service in V3 (V3 – 23 rd April 2013) Products and datasets simplification – 107 products (instead of 201 in V2) with no reduction of information Product upgrades in almost all areas 15 new products (Global, Baltic model forecasts, ocean Colour and InSitu observation products) Each Product is associated with a Product User Manual and a Quality Information Document New search engine, faster access to products, updated FAQs All products available through standard MyOcean interfaces All products can be visualized DISCOVER VIEW DOWNLOAD
16
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Next steps
17
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Next steps Main activity: preparation of V4: – Final MyOcean Service version, to be operated 6 months during the project (April 2014 – Sep. 2014) – Intermediate versions for new products or system functions (CIS) will be defined Reporting of the first period (May 2013) Preparation of the post-MyOcean2 phase in the frame of Copernicus: ECOMF
18
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Some challenges in the year to come Internal: – Involvement, reactivity, acting as a single entity: still needs strong efforts: not an easy task, given the size and the structure of the project – Reduce delays in each delivery or contribution: this is one major issue (example: integration and transition phases) – Keep enthusiasm in our “daily” tasks: this not the end of the story, but the beginning! – Maintain our Service and System State-of-the-Art, well integrated Internal & External: – Prepare, develop and deliver V4 (and intermediate versions) – Take new user requirements into account (from UWS in particular) External: – Engage even more the users in the Service, downstream sector – Maintain and develop relationships with main providers (Space, InSitu), European Agencies, main stakeholders – Be prepared to ECOMF... MyOcean 2 project to prepare a sustained, Service
19
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Annual review agenda
20
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Annual Review Agenda
21
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Annual Review Agenda
22
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Annual Review Agenda
23
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 Annual Review Agenda
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.