Presentation is loading. Please wait.

Presentation is loading. Please wait.

Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully.

Similar presentations


Presentation on theme: "Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully."— Presentation transcript:

1 Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully

2 They said it would never fit there...

3 but it did! Design of BIDOYNG means it fits in 90% of UK substations but there are always exceptions...

4 “Fitting to an open indoor board will be easy” words I may have uttered once These stalks are part of an indoor LV fuse board. Check out the U shaped obstruction around the feeder stalk!!!

5 Fuse panels, layout, enclosures at LV substations vary greatly. We created a solution for the obstructed stalks, at the same time solving a problem for installation of REZAP

6 Kelvatek Web Very successful for managing LV faults, notifications of fault events & reclose operations, and shows necessary BIDOYNG fuse replacements Also has a button for access to power quality data

7 And we should get a nice data plot like this:

8 Dense data, taken every minute Stockport produced over 22M data points in first month Kelvatek Web data plotting slowed, and slowed, then stopped

9 Voltage and current are sampled at 51.2kHz (1024 samples per cycle) Transients are recorded, along with pre-fault data, on all 3 phases 3 phase data is fed to SELF - Single Ended Location of Faults

10 Example SELF Algorithm result : Malwood Road Substation Fault was arcing P-P, P-P-N, 3P & 3P-N 5 transient events recorded over 3 days SELF Calculated a maximum distance of 99m Fault located at 90m Accuracy > 90 %

11 Short term outputs: - Continued development of fault location algorithm - Fault location available to all field staff - Ease of access for power quality data - Fast interactive data presentation


Download ppt "Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully."

Similar presentations


Ads by Google