1
Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully
2
They said it would never fit there...
3
but it did! Design of BIDOYNG means it fits in 90% of UK substations but there are always exceptions...
4
“Fitting to an open indoor board will be easy” words I may have uttered once These stalks are part of an indoor LV fuse board. Check out the U shaped obstruction around the feeder stalk!!!
5
Fuse panels, layout, enclosures at LV substations vary greatly. We created a solution for the obstructed stalks, at the same time solving a problem for installation of REZAP
6
Kelvatek Web Very successful for managing LV faults, notifications of fault events & reclose operations, and shows necessary BIDOYNG fuse replacements Also has a button for access to power quality data
7
And we should get a nice data plot like this:
8
Dense data, taken every minute Stockport produced over 22M data points in first month Kelvatek Web data plotting slowed, and slowed, then stopped
9
Voltage and current are sampled at 51.2kHz (1024 samples per cycle) Transients are recorded, along with pre-fault data, on all 3 phases 3 phase data is fed to SELF - Single Ended Location of Faults
10
Example SELF Algorithm result : Malwood Road Substation Fault was arcing P-P, P-P-N, 3P & 3P-N 5 transient events recorded over 3 days SELF Calculated a maximum distance of 99m Fault located at 90m Accuracy > 90 %
11
Short term outputs: - Continued development of fault location algorithm - Fault location available to all field staff - Ease of access for power quality data - Fast interactive data presentation