Presented To You By BELT MAINTENANCE GROUP
3
The Project THE WORLD’S LONGEST SINGLE FLIGHT CONVEYOR SYSTEM 40.6 KM OF 36” WIDE ST900 STEEL CORD CONVEYOR BELTING SPRING 2005
4
PARTICIPANTS
5
SAFETY IS ALWAYS #1
6
THE SYSTEM
7
THE BELT
8
BELTING STAGED
9
ROLL #1
10
READY TO BEGIN FIRST SPLICE
11
REMOVING THE COVERS
12
STRIPPING THE CORDS
13
CLEANING THE CORDS
14
CLEANING THE BEVEL
15
MEASURING THE CORDS
16
CUTTING THE CORDS
17
APPLYING CEMENT
18
PREPARING BOTTOM COVER
19
APPLYING BOTTOM COVER
20
LAYING THE FIRST CORDS
21
LAYING THE FINAL CORDS
22
READY FOR TOP COVER
23
INSTALLING TOP COVER
24
INSTALLING VULCANIZER
25
COMPLETING THE VULCANIZER
26
INSTALLING ONTO SYSTEM
27
FIRST BELT ON SYSTEM
28
COMPLETED SYSTEM
29
COMPLETE CONVEYOR SERVICES BY BELT MAINTENANCE GROUP WWW.BELTMAINTENANCE.COM