Placer County Water Agency Middle Fork American River Project Plenary Meeting February 8, 2010
2
1 Draft License Application DLA comment period ended December 27, 2010 Received 17 comment letters FERC – 2 Resource Agencies – 5 NGOs – 5 Members of the Public – 5
3
2 Final License Application To be filed with FERC no later than February 28, 2011 Includes response to comments table and modifications to Draft License Application All participants will receive electronic version consistent with CEII, Confidential, and Privileged requirements
4
3 Final License Application Distribution Relicensing participants that received paper copies of the DLA will be issued revised copies : VolumeContentsDistribution Vol 1Initial Statement, Exhibits A, B, C, D, G, and H (Public Information) Revised volume Vol 2Exhibit F (Critical Energy Infrastructure Information [CEII]) Only provided to FERC Vol 3 Books 1– 4 Exhibit E SD A – Proposed Environmental Measures (Public Information) Revised volume Vol 3 Books 5–11 Exhibit E SD B – Final Technical Study Reports (Public Information) Replacement pages Vol 3 Book 12 Exhibit E SD C – BA/BE (Public Information) Revised volume Vol 4Exhibit E and Supporting Documents (SD A and SD B) (Confidential Information) Select distribution of replacement pages Vol 5Exhibit E Supporting Documents SD D – Final Cultural Technical Study Reports SD E – Draft HPMP (Privileged Information) Select distribution of replacement pages
5
4 FERC Relicensing Timeline (Following Submittal of the Final License Application) Does not assume continued negotiation
6
5 Proposed Negotiation Process Submit a request to FERC for additional time and a delay of issuance of the Notice of Ready for Environmental Analysis to complete negotiations on Proposed PM&E Measures Continue collaboration with the stakeholders post-filing of the FLA (March through June 2011) Develop Supplemental Information including rationale supporting consensus of PCWA and Relicensing Participants on resolved issues (if applicable) Submit Supplemental Information to FERC on November 1, 2011
7
6 Proposed Negotiation Major Topic Areas Flow and Reservoir Monitoring Plan Instream Flow and Reservoir Minimum Pool Measure Recreation Plan Vegetation and Integrated Pest Management Plan Others?
8
7 Develop Collaboration Schedule
9
8 Relicensing Participant Letter to FERC (handout) Discuss and edit letter to FERC