Download presentation
Presentation is loading. Please wait.
Published byRodney Malone Modified over 9 years ago
1
Slide # 1 GEO Task AR-07-02 Architecture Implementation Pilot George Percivall gpercivall@opengeospatial.org GEO ADC Meeting, 14 & 15 May 2007
2
Slide # 2 GEO Task AR-07-02 Architecture Implementation Pilot Task Description Call For Participation (CFP) Kickoff Meeting Plans
3
Slide # 3 GEO Task AR-07-02 Architecture Implementation Pilot Lead incorporation of contributed components consistent with the GEOSS Architecture… …using a GEOSS Web Portal and a GEOSS Clearinghouse search facility …to access services through GEOSS Interoperability Arrangements …in support of GEOSS Societal Benefit Areas Title from AR-07-02 task sheet
4
Slide # 4 GEOSS Architecture Implementation Pilot “Pilot” - implementation of interoperability arrangements in a persistent environment Develop recommendations for GEOSS Web Portal and Clearinghouse Demonstration in advance of the EO Summit –Portals, Clearinghouse/catalogues and Services –Scenario supporting one or more GEOSS SBAs. Utilize OGC Procedures for conducting a pilot Schedule: Initiation in 1st quarter 2007, 6 month development
5
Slide # 5 Pilot Approach *RFQ/CFP = Request for Quotation/Call for Participation Execution Task D Kick-offPreparation Task C RFQ/CFP*Development Task B ConceptDevelopment Task A Deploy Task E OGC Pilot Policy and Procedure http://www.opengeospatial.org/ogc/policies/ippp
6
Slide # 6 GEO AR-07-02 Coordination of Activities FEDEO Pilot Tri-Lateral Pilot GEO Tasks? Architecture and Standards for Earth Observation
7
Slide # 7 AI Pilot Milestones CFP Release13 April CFP Responses due11 May Pilot Kickoff meeting5-6 June, ESRIN Deploy, Integrate, TestJune to Sept. Demo CaptureSeptember 2007 Initial Operating CapabilityAfter September Plenary & Summit November 2007 http://www.earthobservations.org/docs/CFP_GEOSS_AR-07-02_11.4.2007.pdf
8
Slide # 8 GEO Task AR-07-02 Architecture Implementation Pilot Task Description Call For Participation (CFP) Kickoff Meeting Plans
9
Slide # 9 CFP seeks collaborative participation in 3 areas Contribute existing services, e.g, portals, catalogs and other services –both services hosted by participants and/or solutions to be hosted by other organizations Develop societal benefit scenarios to guide development and demonstration of pilot services. Refine architecture; potential GEOSS Interoperability Arrangements Call for Participation : http://portal.opengeospatial.org/files/?artifact_id=20953
10
Slide # 10 CFP Responses 24 Responses Received as of 12 May 2007 Argon/IM BKG Compusult Cranfield EC/JRC ESA et.al. FedEO ESA/FAO Portal ESONET, et.al. ESRI FGDC GBIF et.al. GEOmon GMU JPL Meraka et.al. MinesParis NASA NOAA/NGDC DMSP NOAA/NGDC Hazards OSIRIS et.al. Public Warning STFC et.al Ukraine Unidata UT/JAXA Anticipated responses: –INCOSE –GeoConnections –SERVIR –Species 2000 –US State Dept
11
Slide # 11 CFP Architecture Developed from RFI and Responses RM-ODP Viewpoints for architecture –Enterprise: purpose, scope, and scenarios –Information: features, coordinates, semantics –Computational: service oriented architecture Identifies candidate interoperability arrangements –Engineering: component types –Technology: component instances ISO/IEC 10746: IT-Open Distributed Processing - Reference Model (RM-ODP)
12
Slide # 12 Engineering Viewpoint Architecture
13
Slide # 13 GEO Web Portal Requirements Graphical design of Human-Computer Interface shall use GEOSS branding Link to GEO Secretariat web pages Catalog client to GEOSS Clearinghouse TBD hits per/hour with <TBD% degradation of performance vs. no-load performance. Availability >99%, i.e., ~ 7 hours of down time a month Shall be hosted on a computer hosted at TBD. Hosted on a computer at TBD Maintenance performed by TBD org.
14
Slide # 14 GEOSS Clearinghouse Requirements - Draft Catalog service for GEO Portal Catalog client interfaces –ISO 23950 –OGC Catalog Services for the Web (CSW) – Registry for GEOSS Community Catalog Service metadata Registration of items in the Clearinghouse Interface registries hosted at GEO Secretariat. Graphical design of Human-Computer Interface shall use GEOSS branding Provide a catalog service interface: TBD hits/day Availability >99%, i.e., ~ 7 hours of down time a month Future: –Hosted at GEO Secretariat. –Maintenance of content by the GEO Secretariat. –Maintenance of software by the contributing organization.
15
Slide # 15 AI Pilot CFP - SBA Scenarios Disaster: Wildfires Disaster: Tanker oil spill Climate Change: Local effects Ecosystems and biodiversity: Africa Ecosystems and biodiversity: Polar (IPY) Coordination with IP3 Scenarios Seeking users or user-representatives to participate in development and deployment of scenarios in Pilot
16
Slide # 16 Keeping the CFP open Responses to the CFP were due 11 May 11 May was firm close date for –GEO Web Portal –GEOSS Clearinghouse Responses for IOC due before Kickoff Open call for particiation beyond IOC –GEOSS Component Registration Process –Continue to seek additional participants
17
Slide # 17 AR-07-02: Output & Deliverables Persistent capability –GEOSS Webportal –GEOSS Clearinghouse/Catalogues –Services to meet SBA scenarios GEOSS Architecture Implementation Pilot Report
18
Slide # 18 Pilot Kickoff Meeting 5 - 6 June 2007 ESA-ESRIN Frascati (Rome), Italy Registration and information http://www.congrex.nl/07m22/
19
Slide # 19 Pilot Kickoff Objectives Begin the Execution Phase of the Pilot Refine and develop –Collaboration and interoperability goals –Detailed design based on CFP Architecture. –User scenarios suitable for demonstration. Develop detailed plan and schedule for the Execution Phase
20
Slide # 20 Pilot Kickoff Agenda - Draft June 5th 09.00 Plenary 1: Introductions, pilot structure & agenda consensus 11.00Parallel Sessions 13:40Lunch at ESRIN Cafeteria 14.30Parallel Sessions 18.30Adjourn for the day June 6th 09.00Plenary Session #2 - Day 1 Summary 09.45Parallel Sessions 13:40Lunch at ESRIN Cafeteria 14.30Parallel Sessions 18.00Plenary Session #3 - Day 2 Summary, planning recap 19.30Adjourn for the day
21
Slide # 21 GEO Task AR-07-02 Architecture Implementation Pilot Task Description Call For Participation (CFP) Kickoff Meeting Plans George Percivall gpercivall@opengeospatial.org GEO ADC Meeting, 14 & 15 May 2007
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.