Download presentation
Presentation is loading. Please wait.
Published byLydia Clark Modified over 9 years ago
1
Limits of MA cavity C. Ohmori KEK
2
What kind of limit? Voltage Field Gradient Temperature (cooling) –below 200 deg. C for long term (Hitachi Metal Co.). Frequency Environments Materials But, these are not independent ! –Low duty-High voltage vs High duty-Medium voltage
3
Magnetic Cores for Cavity Magnetic Alloys Ferrites Requirements for PRISM B=V/ S=400Gauss
4
PRISM Cavity Design. APS AMP Cavity By C. Ohmori, Y. medium Beam Pipe Side View 33cm
5
RF Cavities Field Gradient of Cavities for Proton Synchrotrons Ferrite Cavities JKJ RF Cavities KEK-PS MA Cavity High Gap Voltage (X 3) & Short Cavity (X 2) Very High Gradient for very short moment (10 s) !
6
RF system R&D 43 kVp/gap using 700 test MA cavity: Equivalent to 150kV/m seems possible by 33 cm-MA cavity at 5 MHz Design goal (60 A RF current) of AMP was achieved. Very compact design for AMP and APS. RF voltage at the gap (red line)
7
Limit for High Field Gradient So far, up to 2 kG, we have tested for Brf. Insulation using SiO2 can stand few volts. (1 volt/20 m=50kV/m in transverse direction.) For PRISM operation (0.1% duty), 150 kV/m seems acceptable. 1%-duty seems acceptable by the forced-air cooling. Power amplifier and driving scheme give another boundary. At 5 MHz, Qf=7x10^9. But, it will be more than 10^10 at 10MHz. RIKEN reports that MA can be used at 20 MHz and higher Qf. More field gradient at higher frequency ? But, MA is affected by outer magnetic field. Few hundreds gauss seems dangerous from the experience of 150 MeV FFAG.
8
Limits for high duty operation Cooling of MA cores is main issue. But, reduction of impedance happens by environmental conditions (capacitance and magnetic field) Cooling schemes –Air KEK-PSBooster –Indirect water150 MeV FFAG –Direct Water coolingJ-PARC, CERN-LEIR
9
Forced Air cooling At KEK-PS booster, ferrite cavities have been replaced by MA cavities. –20 Hz, 40-500 MeV –30-40 kV –Duty : 25-30% –Impedance ? –Power dissipation ? Pop FFAG uses air cooling.
11
Indirect Cooling J-PARC R&D shows 5 kW/core (80 cm OD) seems acceptable without significant impedance reduction. –But, 5kW is not enough for J-PARC –Conflict between cooling efficiency and impedance. 150 MeV FFAG can be operated with 25-50 Hz repetition. Cavity impedance is reduced by the magnetic field. FNAL MA cavity New HIMAC MA cavity (Toshiba core) Saclay Possible to use at high frequency if you design carefully.
12
FNAL J-PARC R&D
13
Direct water cooling Put cores in the water jacket. –J-PARC, COSY, CERN-LEIR J-PARC Cores are coated by epoxy with 0.2 mm thickness. Three different core configurations –Non cut core: 50-60 kW/6 cores X 300 H –Cut core (medium Q): 50-60 kW/6 cores X 150 H –By combination of non-cut and med-Q, hybrid cavity for RCS –Cut core (high Q): 50-80 kW/6 cores X 100 H for MR –Requirements : 45 kW for non-cut and mid-Q, 50- kW for high Q. –Not much impedance reduction by water below 3 MHz. But, not higher than 4 MHz because of capacitance by water
14
Capacitance effects by water Direct Cooling Indirect Water Cooling
18
J=PARC RCS Tunnel
19
CERN-LEIR Cavity ( 2005/4 )
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.