Download presentation
Presentation is loading. Please wait.
Published byKatrina Merritt Modified over 9 years ago
1
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment facilities of Tsyrypinsk estimated area of 25.0 hectares Total Project Cost : 4 mln. $ Expected result: waste utilization in Tsyrypinsk; Possibility of waste recycling from surrounding areas (The complex is designed for 60 thous. people.); Reducing the required areas for waste disposal landfills; Profit through sales of secondary raw materials and recycling sorted waste (metal, plastic, paper, building materials); Profit from sales of electricity that will be produced during the recycling. Current status of project implementation: approved a detailed plan of placing waste processing plant with a sorting line, a platform for temporary waste storage on a land plot near treatment facilities of Tsyrypinsk and granted permission to manufacture of land documents on transfer of land plots for permanent use. Received positive expert report of SE «Ukrderzhbudexpertysa» on the plant feasibility. Obtained an expert report of SE «Ukrderzhbudexpertysa» for construction of the first stage of waste recycling plant with comments, the main of which is the necessity of land allocation for the relevant construction In May, 2013. Last year in SE «Land Management Institute» was ordered the project of land documents for allotment of a land plot for construction of the plant, which is currently undergoing approval and examination. Payback period: First stage –construction of solid waste sorting complex. Second – commissioning of the waste recycling plant with a total capacity of 10 ths. tons / year, and related businesses in processing of secondary raw materials. According to calculations, under favorable conditions, investments will pay off on fifth - sixth year of the enterprise operation. Project benefits : High social value of the project; Environmental feasibility;High profitability of the project; Possibility of introducing complex in two stages; Availability of preliminary project developments, approvals, and land plots ready for construction; Co-financing of the construction from the the local budget; Established and organized system of collection and transportation of ТSP (transport, staff, production facilities) Infrastructure and Resources: Tsyrypinsk is located in the south of Ukraine, 10 km from Kherson; Population is 25,01 thous. people; The route of European importance runs through the city Е97 Kherson-Sochi-Batumi-Acala; The nearest international airports: Simferopol – 250 km, Odesa – 223 km; The nearest ports : river– Kherson – 10 km, sea – Skadovsk 80 km. Sales market: to specialized enterprises on a contractual basis Creating jobs / social effects: the project provides sanitary and household facilities: wardrobe indoor clothing rooms, showers (like changing rooms), dressing rooms, bathrooms, feminine hygiene rooms, dressing overalls rooms, overalls storerooms, heating and meal rooms, medical center. Provided administrative staff rooms, operator of weighing equipment, guards. Employees are provided with special footwear and clothing under the current legislation. Installation of coolers with a deinking water is expected in heating and eating rooms. Water for technical use is expected to take from artesian well. Profitability: sales of secondary raw materials -1 mln. $./year; Sales of electricity and heat-145 thous. $./year.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.