Presentation is loading. Please wait.

Presentation is loading. Please wait.

Upload your final deck on the speaker portal on or before June 20, 2013 at 5:00 pm PT. PowerPoint presentations undergo a brief scrub process and are.

Similar presentations


Presentation on theme: "Upload your final deck on the speaker portal on or before June 20, 2013 at 5:00 pm PT. PowerPoint presentations undergo a brief scrub process and are."— Presentation transcript:

1

2 Upload your final deck on the speaker portal on or before June 20, 2013 at 5:00 pm PT. PowerPoint presentations undergo a brief scrub process and are posted to CommNet for attendee access at least 48 hours prior to the session. No design support will be available onsite. The Scrub Process will include: Verification that required slides are included Remove any non-template logos and graphics from the walk-in slide Remove all comments, hidden slides and speaker notes from slides Set file properties box Reset printability to grayscale Notify Presentation Manager of any images identified as unlicensed for escalation Rename files to match naming convention Correct session title and session code to match printed Mini Guide and Schedule Builder Speakers, you must: Use the provided event template and associated colors, fonts, layout and transition slides Correct product names to follow applicable branding rules

3

4

5 Automating Server-based Build, QA & Test with Visual Studio 2012 Neno Loje Consultant & MVP for Visual Studio ALM, TFS, and Scrum www.teamsystempro.com Based on: TechEd 2012

6 Sprint illustration by Tyler Gibson, Microsoft Corp. Customer can benefit from the feature Developer checks in new feature or bug fix TechEd 2012

7

8

9

10 Visual Studio Evolution

11

12 REQUIREMENTS PRODUCT BACKLOG OPS BACKLOG Monitor Sprint WORKING SOFTWARE Develop Idea to working software Operate Deployment to feedback Define Ideation

13 REQUIREMENTS PRODUCT BACKLOG OPS BACKLOG Monitor Sprint WORKING SOFTWARE Develop Idea to working software Operate Deployment to feedback Define Ideation CYCLE TIME MEAN TIME TO REPAIR

14 REQUIREMENTS PRODUCT BACKLOG OPS BACKLOG Monitor Sprint WORKING SOFTWARE Ideas

15 When you deliver, test and validate exactly what the customer specified, what happens?

16

17 Storyboarding with PowerPoint

18

19 REQUIREMENTS PRODUCT BACKLOG OPS BACKLOG Monitor Sprint WORKING SOFTWARE Ideas Priorities

20 Stickies and Voting sheets

21 Importance to your business Satisfaction with Existing Is this in the right direction? For each idea… Most important Least important Does the existing functionality meet your needs? Once I work with something I can’t find it again I can’t tell what changed from build to build, especially over time I don’t know who is the expert of a given area I need another pair of eyes on my code

22

23 visualstudio.uservoice.com

24

25

26

27 REQUIREMENTS PRODUCT BACKLOG OPS BACKLOG Monitor Sprint WORKING SOFTWARE Ideas Priorities Code & Tests

28 Operational Acceptance (Production) User Acceptance Testing System, Performance, Other -ility Testing Integration Testing Continuous Integration * Check-In * Developer Tests Pass Compile and Link IntelliSense Cost of Error Cost of Error

29 Coding Feedback Loop Test a little Code a little

30

31

32

33

34 REQUIREMENTS PRODUCT BACKLOG OPS BACKLOG Monitor Sprint WORKING SOFTWARE Ideas Priorities Code & Tests Testing

35 Exploratory Testing

36

37

38

39

40 REQUIREMENTS PRODUCT BACKLOG OPS BACKLOG Monitor Sprint WORKING SOFTWARE Ideas Priorities Code & Tests Testing

41

42

43

44

45 REQUIREMENTS PRODUCT BACKLOG OPS BACKLOG Monitor Sprint WORKING SOFTWARE Ideas Priorities Code & Tests Testing Live Site User Experience

46

47 Stakeholder Feedback

48

49

50

51

52

53 Update 1

54

55 REQUIREMENTS Monitor Sprint WORKING SOFTWARE PowerPoint storyboarding Agile planning Suspend and resume Code reviews Feedback collection Unit testing Exploratory testing Continuous integrations Continuous deployments SCOM integration IntelliTrace in production PreEmptive analytics Develop Idea to working software Operate Deployment to feedback Define Ideation

56 Premium Professional Enhanced Profiling (Tier Interaction) Code Clone Analysis Code Metrics Code Coverage Ultimate Web Testing Unlimited Load Testing Team Foundation Server Unit Testing For informational purposes only. No guarantee for correctness. All Trademarks owned by Microsoft Corp. Slide: © Neno Loje, www.teamsystempro.com, All rights reserved. Code Profiler Code Analysis UI Test Automation Code Maps IntelliTrace Collector (for production) UML Diagrams Arch. Discovery (Architecture Explorer) Arch. Validation using Layer Diagrams IntelliTrace® Code Review My Work (Suspend/Resume) This is all public information taken from: http://www.microsoft.com/visualstudio/e ng/products/compare http://www.microsoft.com/visualstudio/e ng/products/compare Team Explorer Everywhere (TEE) Eclipse Plug-In Test Professional PowerPoint Storyboarding Stakeholder Feedback Stakeholder Feedback Backlogs & Planning Microsoft Test Manager (MTM) Continuous Testing Microsoft Fakes (Unit Test Isolation) New in TFS 2012 Exists in TFS 2010 Microsoft Feedback Client

57

58

59 Visit me at the VS ALM booth or e-mail me at: neno.loje@teamsystempro.com

60


Download ppt "Upload your final deck on the speaker portal on or before June 20, 2013 at 5:00 pm PT. PowerPoint presentations undergo a brief scrub process and are."

Similar presentations


Ads by Google