Download presentation
Presentation is loading. Please wait.
Published byThomasine Maria Johnson Modified over 9 years ago
1
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014
2
Upcoming Task Order ACRs / ECPs were prioritized last FRB Prioritization results were delivered to NETC N74
3
Software IMPORT AIM I/II RRL into CPM [NETC] Based on ACR 333, the Contractor shall implement a software modification to import the Site RRL from AIM I/II into the Content Planning Module.
4
Software Multiple Discussion Points per Page in AIM LO Module Based on ACR 369, the Contractor shall implement a software modification to provide an option to print more than one discussion point and Related Instructor Activity per page in the Lesson Plan.
5
Software Provide Indication of Incomplete and Complete Task in CPM JDTA Tab Based on ACR 353, the Contractor shall implement a software modification provide some indicator within the tree when an individual Job Duty or Task statement has all of the fields completed, allowing it to be submitted for acceptance and approval..
6
Software Allow Trainee Guide Sheets as an option for IMI Based on ACR 312, the Contractor shall implement a software modification allowing Sheets to be available for non-ILT Sections.
7
Software Specific Reports added to CPM AIM LO –Allow for report to be generated by a CPM Manager to list all users attached specifically to their Center including Role and email address and days since last activity. –Allow for report to be generated by a CPM Manager to list all projects attached specifically to their Center including Project Owner and completion status.
8
Software Add Fields to CPM Account Request Form Based on Government direction, the Contractor shall implement a software modification creating two free text fields on the CPM Account Request Form for “Government Sponsor / Learning Center POC” name and “Date of last IA Training Completion”.
9
ECPs Versioning Resources/Data Items/KSATRs Data Retention in CPM Track Access/Changes to data in AIM I/AIM II/LO Module
10
AIM I/II Software Changes Purpose of the Course for AIM II Lesson Plan (LP)/Trainee Guide (TG). Multi-volume TGs in AIM II. 'How to Use ' Entry in AIM II LP/TG. Letter of Promulgation in AIM II. Course Master Schedule in front matter of AIM II LP. Modification TPP functionality change.
11
Software Add, delete, and modify elements/sub-elements in Lesson Overview/Summary [SSP – s/w mod] The Contractor shall provide the ability for users to add/delete elements and sub-elements, and modify names of existing elements in the Overview and Summary areas of a lesson in the LO Module.
12
Software Open PPS to assigned slide number. The Contractor shall modify LO Module to permit the assigned slide to open using PPS IMM in LO Module RRL.
13
Software Update other sites' RRL items to match the CCMM RRL. The Contractor shall develop an ECP to modify LO Module so user with appropriate privilege can update the other sites' RRL items to match CCMM.
14
Software Add bookmarking feature in CPM and LO Module.The Contractor shall modify CPM and AIM to add a bookmarking feature in CPM and LO Module to load the data to the screen to the same position where the user last was positioned before they exited.
15
Software Include/exclude matter in preview of a Lesson Plan. The Contractor shall modify the LO Module to permit the user to include/exclude front matter, content, and back matter when previewing the Lesson Plan.
16
Software Move RRL from one category to another. The Contractor shall develop an ECP to modify AIM I/II/LO Module to allow user to move RRL item from one category to another - approved or not.
17
Software Notify user when course is modified. The Contractor shall develop an ECP to provide user notifications when a course is modified in the LO Module on the organization's Central Site Citrix instance.
18
Software Add 'delete unused exercise' option in ECG. The Contractor shall modify AIM I to add a 'delete unused exercise' option in the AIM I ECG.
19
Software Suggest a new KSATR in CPM. The Contractor shall develop an ECP to permit a user to suggest a new KSATR in CPM.
20
Software Correct TG Sheet numbering in LO Module. The Contractor shall modify LO Module to number TG Sheets correctly when a subset of Sheets are printed for a Course.
21
Software Expand project role capability in CPM The Contractor shall develop an ECP to expand the project role functionality to allow assigning Edit privileges to a specific training site.
22
ACRs
23
AIM FRB Specific Topics Tool to manage active projects and identify projects at risk. Better ways to manage ECP’s or action items. Use of existing resources AIM LO Module TG produces a non-intelligent PDF No content repository or link to CPM Ability to link to outside analysis documents CPM Projects link to JDTA needs work, should also be able to link task, sub-task and KSATR (KSATR different color) Outline Sheet needs references added and should automatically populate section outline. Does the tool reflect the process How do we make the process better
24
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.