Case Study: Tasmanian Department of Health and Human Services (including Royal Hobart Hospital) buildingSMART International Conference Tokyo 2012 1.

Similar presentations


Presentation on theme: "Case Study: Tasmanian Department of Health and Human Services (including Royal Hobart Hospital) buildingSMART International Conference Tokyo 2012 1."— Presentation transcript:

1 Case Study: Tasmanian Department of Health and Human Services (including Royal Hobart Hospital) buildingSMART International Conference Tokyo 2012 1

2 Wayne Eastley Director, bimSCOPE Pty Ltd Manager, Asset Sustainability, Department of Health and Human Services Member, Tasmanian Government Spatial Committee Member, Tasmanian Climate Change Reference Group (developing State-wide greenhouse gas emissions strategy) Board Member, buildingSMART Australasia Co-author, (Australian) National Building Information Modelling Initiative 2

3 Case Study: Tasmanian Department of Health and Human Services Using BIM to drive the cost effective and intelligent building planning, design, construction, management, operations and maintenance practices required for a low carbon future 3

4 Department of Health and Human Services (DHHS) Four acute hospitals, regional hospitals and other facilities providing acute, mental health, disability, children and youth services for the Tasmanian population. Facing issues of aging population, increasing technology and costs. 4

5 Reasons for DHHS considering BIM 5

6 6

7 BIM for Royal Hobart Hospital Redevelopment 7

8 0-2D Manual and CAD based (2D or 3D) 1 - Modelling Single-disciplinary use of object-based 3D modelling software within one discipline 2 - Collaboration Sharing of object-based models between two or more disciplines 3 - Integration Integration of several multi-disciplinary models using model servers or other network-based technologies RepresentationFull Information CapturePrototype 3D CAD Modelling Software Single Platform / IFC Interoperability BIM 0A0B1A1B2A2B3A3B Manual 2D CAD 2D3D Intelligent 3D One Way Two Way Local Server Web Server ISOLATEDINTEGRATEDCOLLABORATIVE Level 1 Business Model: Level 0Level 2Level 3 PaperOnline file sharingOnline file sharing plus shared Library of project data Integrated Web Services BIM Hub 2D CAD2D or 3D CADSeparate BIM Models for each design team BIM Maturity Assessment Framework – Australia and United Kingdom Integrated, Interoperable Data Tools Design Data Australia United Kingdom 8

9 Owner’s perspective on developing BIM specifications 9

10 Using OpenBIM 10

11 Building Life Cycle 11

12 National BIM Initiative (Global initiative required) 12

13 13

14 NASA Sustainability Base 14

15 NASA Inductive Monitoring System 15