Download presentation
Presentation is loading. Please wait.
Published byGervais Bridges Modified over 9 years ago
1
ENVIRONMENTAL FACT MATTERS ! EIFair AS, Pob 66, N-2027 Kjeller, Norway Phone: +47 64 84 43 44, E-mail: sales@eifair.no, www.eifair.com
2
The Problem To preserve nature and still allow for industrial development needed. Negative factors from emissions to air: - Acidification of surface water = Death of Fish, Insects and other Creatures. - Eutrofication = Change of biodiversity. - Acidification of soil = Change of vegetation. - Increased Ozone concentration = Reduction of Crops and Forests. Human health issues. - Increased level of Green House Gases.
3
The Problem Solvers World leading experience and knowledge NIVA= Water / NILU= Air / NINA= Nature More than 350 scientists and 50 years of relevant R & D The Oil industry’s requirement and needs Approx. Euro1,5 mill in project development cost
4
The Solution = EIF-AIR A web based tool operated by the client for simulation / evaluation of environmental impacts from emissions to air. © EIFair AS EIF-AIR = Environmental Impact Factor for emissions to Air.
5
EIF-AIR Simulator Reports EIF Server Background Data How is EIF-AIR working? Client data – ID – Location – Emissions Verification & documentation for internal and external use.
6
Conclusion
7
Model Results
8
Report Expl.3 – 6 Scenarios Planned on-shore refinery Max N deposition for different scenarios EIF-Air values for different scenarios
9
Report Expl.4 - 3.party Vessel ScenarioEIF-Air per ton N Platform 0.27 Vessel0.60 - 0.76 Conclusion: In this example: 2.2-2.8 times more beneficial to reduce on vessel
10
Source IEA/Shell Energy Sources / Need for EIF-AIR EIF-AIR
11
The ”Lifecycle” of EIF-AIR within the Energy industry © EIFAIR AS EIF-AIR ERMS EIF-AIR New Technology Abatement Strategies Field design Prod. technology Environmental Issues.
12
Advantages Existing solutions = 3 – 4 Suppliers. - 4 months delivery. - Expensive. - Multiple reports. EIF- AIR = 1 Supplier / 1 Report. 24 hours delivery. - Quick delivery. - Great Flexibility. - Cost effective. - 100% Confidentiality. © EIFair AS
13
EIF-AIR status 2010 “Field Proven” fully operational for Norway. 2007/2009 reference projects in Norway: Snow-white/Heidrun/Tambar/Glitne/Goliat. Part of Statoil’s environmental evaluation program. Test projects with prospective clients. Full North Sea version ready mid of 2010. Development together with clients possible. Development plan decided by the board. © EIFair AS
14
ENVIRONMENTAL FACT MATTERS ! EIFairAS, Pob 66, N-2027 Kjeller, Norway Phone: +47 64 84 43 44, E-mail: sales@eifair.no, www.eifair.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.