Presentation is loading. Please wait.

Presentation is loading. Please wait.

Next steps / Summative assessment IL Strategy Workshop Day 3 Session 5.

Similar presentations


Presentation on theme: "Next steps / Summative assessment IL Strategy Workshop Day 3 Session 5."— Presentation transcript:

1 Next steps / Summative assessment IL Strategy Workshop Day 3 Session 5

2 Expectations Within 6 months of the workshop, participants will: Develop an IL strategic action plan based on the content of the workshop and tools introduced Develop an advocacy action plan, with steps to raise awareness of your IL programme Or another appropriate, equivalent task which meets the needs of the consortium and the member institutions Each participant will be required to submit a report about this to the consortium 2

3 Workshop – Day 1 Module One: Conceptions of Information Literacy Unit 1.1: Information literacy concepts Unit 1.2: Information literacy models, standards and frameworks Unit 1.3: Information literacy case study presentations 3

4 Workshop – Day 2 Module Two: Institutional Readiness Unit 2.1: Context analysis Unit 2.2: Stakeholder analysis Unit 2.3: Addressing the challenges & devising solutions 4

5 Workshop – Day 3 Module Three: Devising an IL Strategy & Communication Plan Unit 3.1: Communications & Advocacy Unit 3.2: Measuring progress & capturing risk Unit 3.3: Devising an IL Strategy Unit 3.4: Sharing IL Strategy & communication plans Unit 3.5: Agreeing next steps 5

6 What are your next steps?

7 What additional support do you need? Siobhan Duvigneau, IDS

8 Why complete an action plan? Consortium has invested in you and your institution in offering training Good training and capacity building practice shows that training and professional development doesn’t just occur within the 3-4 days of the workshop. Follow on actions are essential to ensure participants are able to put skills, knowledge and ideas into practice and make a tangible, and timely contribution to improved services to users/institutions. Expect to spend 1-2 days on a follow on activity. This should be something you are doing as part of your everyday job 20/10/20158

9 What you could achieve An IL strategic action plan based on the content of the workshop and tools introduced An advocacy action plan, with steps to raise awareness of your IL programme Another appropriate, equivalent task which meets the needs of the consortium and the member institutions 20/10/20159

10 Consider Which of these activities best suits the needs of my institution and consortium? What support would I need from my manager and is he/she likely to give this? How would I be able to demonstrate that I have successfully completed an agreed action? 20/10/201510

11 3.5.1 Action plan template Spend 30 minutes working alone or with a colleague from the same institution considering your action plan If possible, type this and email it to the administrator Be prepared to discuss in plenary 20/10/201511

12 Final Assessment

13 Workshop evaluation and closing Follow up – what, when, who? Post workshop assessment (includes evaluation) https://www.surveymonkey.com/s/infolitstrat _postsurvey: https://www.surveymonkey.com/s/infolitstrat_ postsurvey Complete within one week 13

14 This work is licensed under a Creative Commons Attribution- ShareAlike 3.0 Unported License.Creative Commons Attribution- ShareAlike 3.0 Unported License 20/10/201514 Course materials developed by Siobhan Duvigneau Information Literacy manager, IDS S.Duvigneau@ids.ac.uk


Download ppt "Next steps / Summative assessment IL Strategy Workshop Day 3 Session 5."

Similar presentations


Ads by Google