Download presentation
Presentation is loading. Please wait.
Published byDana Grant Modified over 9 years ago
1
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #21 San Francisco, California Opening Plenary Vivek Gupta vivek.g.gupta@intel.com
2
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 2 WG Officers OfficeOfficer ChairVivek Gupta Vice ChairMichael Williams SecretaryXiaoyu Liu EditorQiaobing Xie 802.11 LiaisonDavid Hunter 802.16 LiaisonPeretz Feder IETF LiaisonYoshihiro Ohba The WG has 69 voting members as of this meeting
3
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 3 IEEE 802.21 Meeting Server Details External website: http://www.ieee802.org/21 Local: Meeting website: http://802server/21 Meeting website: http://10.128.0.11/21http://10.128.0.11/21 During meetings post documents at local server Get DCNs from Chair:
4
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 4 Attendance Electronic Attendance ONLY Electronic Attendance –http://ieee802.facetoface-events.com/groups/802.21/attendance.php –http://newton.events.ieee.org/ –Enter your personal information and profile –Mark attendance during every session Total number of sessions: 14 11 sessions for 75% attendance to be counted towards voting membership Room reserved for evening sessions: – 7:30 – 9:30 pm or later in case we need to use it –Extra credit for evening sessions All attendance records on the 802.21 website –Please check the attendance records for any manual errors
5
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 5 Voting Membership 802.21 Voting Membership described in –DCN#: 21-06-0075-02-0000 Maintenance of Voting Membership –Two Plenary sessions out of four consecutive Plenary sessions on a moving window basis –One out of the two Plenary session requirement could be substituted by an Interim session
6
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 6 Voting Membership Reciprocal Voting Rights (Under Review) Attendance credit policy with other 802 WG –802.16 - only during Joint LMSC Plenary sessions –802.20 - both during Interim and Joint LMSC Plenary sessions –To get credit for attendance in the above WG meetings send email to the Chair with a copy to Secretary
7
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 7 Voting Membership Issues If an 802.21 member does NOT attend 802.21 sessions for a (Very Long Time.. 16+ months) and maintains rights in 802.21 by attending other groups only (802.20/802.16), should that be allowed? Can members gain attendance credit in multiple groups for attending a single session/meeting, or just one of the groups of their choice only? –E.g. (gain Attendance credit in both 802.21 and 802.20 by attending 75% sessions in 802.21 ONLY)
8
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 8 WG Letter Ballot IEEE 802 Rules specify: –Working Group Membership shall be lost if two consecutive, or two of any three consecutive, Working Group letter ballots are not returned or are returned with an abstention other than for 'lack of technical expertise
9
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 9 Miscellaneous Meeting Logistics Breaks –802.21 WG would break as follows: AM Coffee break: 10:00-10:30 am Lunch:12.00 noon until 1.00 pm PM Coffee break: 3:00 – 3:30 pm Wednesday Evening Social –6.30 pm - 9.00 pm http://ieee802.face2face-events.com/wireless/attendee.html
10
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 10 Registration and Media Recording Each Attendee must provide contact information and pay conference fee Conference fee has to be paid through the registration desk at the hotel or through sponsor Failure to pay conference fee results in loss of credit for voting rights Photography not permitted unless approved by WG Chair Audio taping of IEEE 802.21 meetings is NOT allowed Media – Press and Analyst briefings –Only the 802.21 WG Chair and WG Vice-Chair are allowed to give verbal statements/interviews to the media on behalf of the IEEE 802.21 working group
11
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 11 Membership & Anti-Trust Individual membership –In all IEEE standards meetings, membership is by individual, hence you do not represent a company or organization. Anti-Trust laws –The Anti-Trust laws forbid the discussion of prices within our meetings.
12
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 12 The IEEE-SA strongly recommends that at each WG meeting the Chair or a designee: –Show slides #1 through #5 of this presentation –Advise the WG attendees that: The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is encouraged; There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. –Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and the five slides were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) that the participant believes may be essential for the use of that standard; Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. It is recommended that the WG chair review the guidance in the Standards Companion on inclusion of potential Essential Patent Claims by normative reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees.
13
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 13 Highlights of the IEEE-SA Standards Board Bylaws on Patents in Standards –Participants have a duty to tell the IEEE if they know (based on personal awareness) of potentially Essential Patent Claims they or their employer own –Participants are encouraged to tell the IEEE if they know of potentially Essential Patent Claims owned by others This encouragement is particularly strong as the third party may not be a participant in the standards process –Working Group required to request assurance –Early assurance is encouraged –Terms of assurance shall be either: Reasonable and nondiscriminatory, with or without monetary compensation; or, A statement of non-assertion of patent rights –Assurances Shall be provided on the IEEE-SA Standards Board approved LOA form May optionally include not-to-exceed rates, terms, and conditions Shall not be circumvented through sale or transfer of patents Shall be brought to the attention of any future assignees or transferees Shall apply to Affiliates unless explicitly excluded Are irrevocable once submitted and accepted Shall be supplemented if Submitter becomes aware of other potential Essential Patent Claims –A “Blanket Letter of Assurance” may be provided at the option of the patent holder –A patent holder has no duty to perform a patent search –Full policy available at http://standards.ieee.org/guides/bylaws/sect6-7.html#6 Slide #1
14
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 14 6.2 Policy IEEE standards may be drafted in terms that include the use of Essential Patent Claims. If the IEEE receives notice that a [Proposed] IEEE Standard may require the use of a potential Essential Patent Claim, the IEEE shall request licensing assurance, on the IEEE Standards Board approved Letter of Assurance form, from the patent holder or patent applicant. The IEEE shall request this assurance without coercion. The Submitter of the Letter of Assurance may, after Reasonable and Good Faith Inquiry, indicate it is not aware of any Patent Claims that the Submitter may own, control, or have the ability to license that might be or become Essential Patent Claims. If the patent holder or patent applicant provides an assurance, it should do so as soon as reasonably feasible in the standards development process. This assurance shall be provided prior to the Standards Board’s approval of the standard. This assurance shall be provided prior to a reaffirmation if the IEEE receives notice of a potential Essential Patent Claim after the standard’s approval or a prior reaffirmation. An asserted potential Essential Patent Claim for which an assurance cannot be obtained (e.g., a Letter of Assurance is not provided or the Letter of Assurance indicates that assurance is not being provided) shall be referred to the Patent Committee. A Letter of Assurance shall be either: a) A general disclaimer to the effect that the Submitter without conditions will not enforce any present or future Essential Patent Claims against any person or entity making, using, selling, offering to sell, importing, distributing, or implementing a compliant implementation of the standard; or b) A statement that a license for a compliant implementation of the standard will be made available to an unrestricted number of applicants on a worldwide basis without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination. At its sole option, the Submitter may provide with its assurance any of the following: (i) a not-to-exceed license fee or rate commitment, (ii) a sample license agreement, or (iii) one or more material licensing terms. IEEE-SA Standards Board Bylaws on Patents in Standards Slide #2
15
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 15 Copies of an Accepted LOA may be provided to the working group, but shall not be discussed, at any standards working group meeting. The Submitter and all Affiliates (other than those Affiliates excluded in a Letter of Assurance) shall not assign or otherwise transfer any rights in any Essential Patent Claims that are the subject of such Letter of Assurance that they hold, control, or have the ability to license with the intent of circumventing or negating any of the representations and commitments made in such Letter of Assurance. The Submitter of a Letter of Assurance shall agree (a) to provide notice of a Letter of Assurance either through a Statement of Encumbrance or by binding any assignee or transferee to the terms of such Letter of Assurance; and (b) to require its assignee or transferee to (i) agree to similarly provide such notice and (ii) to bind its assignees or transferees to agree to provide such notice as described in (a) and (b). This assurance shall apply to the Submitter and its Affiliates except those Affiliates the Submitter specifically excludes on the relevant Letter of Assurance. If, after providing a Letter of Assurance to the IEEE, the Submitter becomes aware of additional Patent Claim(s) not already covered by an existing Letter of Assurance that are owned, controlled, or licensable by the Submitter that may be or become Essential Patent Claim(s) for the same IEEE Standard but are not the subject of an existing Letter of Assurance, then such Submitter shall submit a Letter of Assurance stating its position regarding enforcement or licensing of such Patent Claims. For the purposes of this commitment, the Submitter is deemed to be aware if any of the following individuals who are from, employed by, or otherwise represent the Submitter have personal knowledge of additional potential Essential Patent Claims, owned or controlled by the Submitter, related to a [Proposed] IEEE Standard and not already the subject of a previously submitted Letter of Assurance: (a) past or present participants in the development of the [Proposed] IEEE Standard, or (b) the individual executing the previously submitted Letter of Assurance. IEEE-SA Standards Board Bylaws on Patents in Standards Slide #3
16
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 16 The assurance is irrevocable once submitted and accepted and shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal. The IEEE is not responsible for identifying Essential Patent Claims for which a license may be required, for conducting inquiries into the legal validity or scope of those Patent Claims, or for determining whether any licensing terms or conditions are reasonable or non-discriminatory. Nothing in this policy shall be interpreted as giving rise to a duty to conduct a patent search. No license is implied by the submission of a Letter of Assurance. In order for IEEE’s patent policy to function efficiently, individuals participating in the standards development process: (a) shall inform the IEEE (or cause the IEEE to be informed) of the holder of any potential Essential Patent Claims of which they are personally aware and that are not already the subject of an existing Letter of Assurance, owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents; and (b) should inform the IEEE (or cause the IEEE to be informed) of any other holders of such potential Essential Patent Claims that are not already the subject of an existing Letter of Assurance. IEEE-SA Standards Board Bylaws on Patents in Standards Slide #4
17
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 17 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don ’ t discuss the interpretation, validity, or essentiality of patents/patent claims. Don ’ t discuss specific license rates, terms, or conditions. –Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don ’ t discuss fixing product prices, allocation of customers, or dividing sales markets. Don ’ t discuss the status or substance of ongoing or threatened litigation. Don ’ t be silent if inappropriate topics are discussed … do formally object. --------------------------------------------------------------- If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org or visit http://standards.ieee.org/board/pat/index.html See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt Slide #5
18
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 18 Copyright Under the current US copyright law — the author of information is deemed to own the copyright from the moment of creation The IEEE Bylaws require copyright of all material to be held by the IEEE –Must consult with IEEE for re-use of copyright material The IEEE Standards accomplishes transfer of copyright ownership through the Project Authorization Request (PAR) process
19
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 19 IEEE SA News Changes to the IEEE Standards Association Operations Manual and Standards Board Bylaws –http://standards.ieee.org/board/pro/2006changes.pdf Changes to the IEEE-SA Standards Board Bylaws and IEEE-SA Standards Board Operations Manual (July - December 2006) including affiliation declarations –http://standards.ieee.org/resources/index.html#guides
20
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 20 New Members New Member Count =
21
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 21 New PARs under Consideration http://ieee802.org/16/meetings/mtg50/lmsc/pars.html 802.3 : P802.3az: Energy Efficient Ethernet 802.11:P802.11s: Extended Service Set Mesh Networking [PAR Modification] 802.11: P802.11z: Extensions to Direct Link Setup (DLS) 802.11:P802.11n PAR Extension Request 802.15: P802.15.4c: Amendment to 802.15.4 supporting the WPAN needs in China
22
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 22 Summary of Completed Work Draft Specification (P802-21-D01) confirmed – May 2005 WG Letter Ballot Progress –LB #1 Completed (April 30, 2006), Return Ratio: 81%, Approval Ratio: 26% –LB #1a Recirculation Completed (Oct 23, 06), Return Ratio: 85%, Approval Ratio 30% –LB #1b Recirculation Completed (Jan 04, 07), Return Ratio: 86%, Approval Ratio 46% –LB #1c Recirculation Completed (Feb 19, 07), Return Ratio: 86%, Approval Ratio 66% –LB #1d Recirculation Completed (Apr 30, 07), Return Ratio: 86%, Approval Ratio 75% –LB #1e Recirculation Completed (Jul 15, 07), Return Ratio: 85%, Approval Ratio 95% Ad hoc Meeting at ETRI, Korea June 13-15 –Discussion of various contributions for comment resolution for LB#1d Requirements submitted to ITU through 802.18 for IMT-Advanced Interaction with other 802 groups and other SDOs –802.16: MIH solution incorporated in 802.16g in Nov 2005 –802.11: MIH solution incorporated in 802.11u in Sep 2006 –3GPP: Requirements for IS Accepted at SA2#52 in May-2006, Concept of Information Service accepted at SA2# 58 in Orlando
23
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 23 Objectives for the July Meeting Complete LB Recirculation #1e Comment Resolution –Technical Comment Resolution –Discuss submitted contributions –Plan for going to Sponsor Ballot Discussion on future WG activities –Security Signaling –Multi-radio Power Management Interaction with other 802 groups and external SDOs –Update from IETF and discussion of various proposals –3GPP next steps discussion Next Steps on IMT-Advanced
24
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 24 Revised 802.21 Timeline (Jan 2007 ) IEEE 802.21 ECSG formed – March 2003 IEEE 802.21 WG formed – March 2004 Requirements development – September 2004 Call for Proposals – October 2004 Harmonized Single Proposal Confirmed by the WG – May 2005 Ongoing WG Comment Resolution started – July 2005 WG Comment Resolution completed – January 2006 Start of WG Letter Ballot – March 2006 Start of IEEE 802 Sponsor Ballot – Sept 2006 (March 2007) (July-07) IEEE 802 Draft Standard Approved – 2 nd Half 2007 ??? Ongoing Interaction with Other Standards Organization (3GPP, 3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups
25
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 25 Plan to meet 802.21 Timeline Start of IEEE 802 Sponsor Ballot – (July 2007) For EC Approval in July 2007 –=> Draft Approval Rating > 90% (minimum), preferably >95% LB #1: –Starts March 31, Ends April 30: Return Ratio: 81% Approval Ratio 26% –Comment Resolution for LB #1 (May, June ad hoc, Sep) =>Recirculation LB #1a (recirculation): –Starts Oct 06, Ends Oct 23: Return Ratio: 85%, Approval Ratio: 30% –Comment Resolution for LB #1a (Ad Hoc in Oct, Nov meeting) =>Recirculation LB #1b (recirculation): –Starts Dec 10, Ends Jan 03: Return Ratio: 86%, Approval Ratio: 46% –Comment Resolution for LB #1b (Jan meeting) => Recirculation LB #1c (recirculation): –Starts Feb 04, Ends Feb 19: Return Ratio: 86%, Approval Ratio: 66% –Comment Resolution for LB #1c (Ad hoc in Feb, March meeting…) LB #1d (recirculation): –Starts Apr 13, Ends Apr 27: Return Ratio: 86%, Approval Ratio: 75% –Comment Resolution for LB #1d (May meeting, Ad hoc in June:…) LB #1e (recirculation): –Starts June 30, Ends July 14: Return Ratio: 85%, Approval Ratio: 95% –Comment Resolution for LB #1e (July meeting) LB #1f (Confirmation recirculation): –Starts July ??, Ends July ??
26
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 26 Future Sessions - 2007 Interim: Sept 16 th – 21 st,2007, Hawaii, Big Island –Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 11 th – 16 th,2007, Atlanta –Co-located with all 802 groups
27
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 27 Future Sessions - 2008 Interim: Jan 13 th – 18 th, 2008 (Taipei, Howard Plaza Hotel ) –Meeting co-located with all 802 groups Plenary: March 16 th – 21st,2008, Orlando, Florida –Co-located with all 802 groups Interim: May 11 th – 16 th, 2008 (Jacksonville) –Meeting co-located with 802.11/15/18/19/20/22 Plenary: July 13 th – 18 th,2008, Denver, Colorado –Co-located with all 802 groups Interim: Sept 7 th – 12 th,2008, ( Salt Lake City/Minneapolis ?? ) –Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 9 th – 14 th,2008, D allas, TX –Co-located with all 802 groups
28
21-07-0261-00-0000-WGsession21_Opening_Notes.ppt July 2007 Vivek Gupta, Chair, 802.21Slide 28 Future Sessions - 2009 Interim: Jan ???? –Meeting co-located with 802.11/15/18/19/20/22 Plenary: March Oahu-Hawaii/Rome –Co-located with all 802 groups Interim: May ???? –Meeting co-located with 802.11/15/18/19/20/22 Plenary: July ???? –Co-located with all 802 groups Interim: Sept ???? –Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov ???? –Co-located with all 802 groups
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.