CONDITIONAL GRANTS: 4 th QUARTER ROADS & TRANSPORT
2
TO INFORM THE NCOP OF THE: Roads Conditional Grants and Capital Expenditure of the Free State Dept. of Public Works, Roads & Transport for the 2005/06 financial year, relating to Roads & Transport PURPOSE
3
Background Discussion Strategic Focus Delays in infrastructure delivery Flood damage & infrastructure Backlog Corrective measures PIG Grant allocation OIG Grant allocation Flood funds allocation Financial performance Flood damage & infrastructure backlog CONTENTS
4
Challenges presented infrastructure delivery development Appropriate capacity and staffing The legacy of the past Lack of monitoring and evaluation BACKGROUND
5
DISCUSSION Role of Roads infrastructure in socio-economic development Accelerated infrastructure development Major causes for delaying infrastructure delivery Techniques employed Review current processes Additional technical staff Partnership with Treasury Improved consultation Project Management
6
Policy imperatives Value for money EPWP principles Socio-economic development stimulation Enhanced turn-around times IDIP Limitations Non-alignment Silo planning Project identification Strategic Focus
7
: Delays in Infrastructure Delivery Inclement weather conditions for the past three months Poor alignment of infrastructure planning to budget cycle Lack of capacity for infrastructure planning Slow procurement processes Poor relations and poor communication within and between departments
8
: FLOOD DAMAGE FREE STATE ROAD NETWORK
9
HISTORICAL SITUATIONAL ANALYSIS : 1988 heavy rainfalls No funding made available to redress the damage Accumulation of the backlog through the years In 2005 the road infrastructure backlog = R5,2billion Freight and transport growth in province 2006 backlog = R7,3 billion
10
Floods 2006: Damages to Roads & bridges Bridges, Gravel Roads Surfaced Roads
11
CAUSES Above-average rainfall in January 2006 – saturating the soils Even higher intensity during February 2006 – dramatic increase in surface storm water Dams broke – extensive water- damage down-stream :
12
PROBLEM STATEMENT : Approaches to bridges washed away; Bridge decks damaged; Drainage structures (pipes) exposed; Gravel wearing course washed away; Erosion damage along roads and, Underlying damage
13
Approaches to bridges washed away
14
Bridge decks damaged
15
Drainage structures (pipes) exposed
16
Gravel wearing course washed away
17
Erosion damage along roads Erosion damage along roads
18
Underlying damage Underlying damage due to water ingress into brittle and cracked seals due to water ingress into brittle and cracked seals The total effect will only be evident in the months to come…
19
Underlying damage Underlying damage due to water ingress into brittle and cracked seals due to water ingress into brittle and cracked seals
20
Resultant damages
21
!!!??
23
Caledon River-Wepener
24
CORRECTIVE MEASURES Improved infrastructure delivery management Alignment of infrastructure plans to strategic plans and to FSGDP Participatory approach Forward planning Infrastructure delivery improvement plans implementation Improved monitoring & continuous progress reporting Construction industry development board Populating technical capacity
25
PROVINCIAL CONDITIONAL GRANTS (PIG)
26
FREE STATE OWN GRANTS (OIG)
27
FLOOD GRANTS
28
FLOOD DAMAGE FINANCIAL IMPLICATIONS TOTAL COST R 539, 682 M This cost includes repairs to: STRUCTURES, REGRAVELLING PATCHING AND MILLING CLEANING OF CULVERTS VEGETATION CONTROL
29
SUGGESTED SOLUTIONS –Continuous engagement for additional funding Treasury National PCC –Emergency solutions Reduction of minimum speed limit to 60 km/h Convert paved roads to gravel roads
30
SUGGESTED SOLUTIONS –Continuous engagement for additional funding Treasury National PCC –Emergency solutions Reduction of maximum speed limit to 60 km/h Convert paved roads to gravel roads
31
SPENDING PATTERNS FOR 2005/06 BudgetExpenditure Under spending Equitable share644649(9) FS Conditional Grant (OIG) 17213141 Prov Grant (PIG)83758 Flood Grant000 Total89985540
32
DEPARTMENTAL PERFORMANCE I.T.O. CAPITAL EXPENDITURE BudgetExpenditure Under spending Current Compensation 3573498 Current Goods and Services 319337(18) Transfer440 Capital21616650 Total89685540
33
ROLL-OVER REQUEST Upgrade of SederhouseR 0,739m Upgrading of Registration Offices: ReitzR 0,328m Constr Jagersfontein - Trompsburg RoadR 44,570m Regravel in LejweleputswaR 0,045m Roadsign Contract R 0,093m Tourism Route in QwaqwaR 0,260m Constr of Pallisade & road to SeloseshaR 0,427m R&R Odendaalsrus – BothavilleR 1,858m Reconstruct A54R 2,761m
34
WE THANK YOU!