Download presentation
Presentation is loading. Please wait.
Published byLynne Mathews Modified over 9 years ago
1
CONTRACTOR MANAGEMENT AT XSTRATA COAL
2
INDEX Location of sites Employees vs. Contractors Contractor selection phase Pre-engagement operational phase Engagement operational phase Post engagement / project completion phase Completion stage Common problems experienced Future initiatives
3
Location of sites Middelburg Witbank Ogies Tweefontein Division iMpunzi Division Rietspruit Phoenix Tavistock ATC ATCOM Phoenix Tavistock ATC ATCOM Waterpan Boschmans Witcons South Witbank Goedgevonden Waterpan Boschmans Witcons South Witbank Goedgevonden Mpumalanga Division DTJV - Douglas DTJV - Middelburg Tselentis Spitzkop Tselentis Spitzkop
4
Employees vs. Contractors MineTons/mthNo. emplNo. Contr% of Workforce Arthur Taylor16400053713820 ATCOM1760003637918 Boschmans28000056828233 Goedgevonden60000517397 Phoenix847004308316 South Witbank28000034229744 Spitzkop6000043322134 Tavistock17750049229538 Tselentis1150009273789 Waterpan11000014143776 Witcons1900003949720
5
Employees vs. Contractors Strength Injuries Contractors contribute to 31% of the total number of injuries
6
Management Of Contractors CONTRACTOR SELECTION PHASE PRE-ENGADGEMENT OPERATIONAL PHASE OPERATIONAL PHASE The company Preparation Evaluation criteria Tender Assessment in accordance with Company Procedure Selection / Rejection Completion of all documentation Including contract, indemnities, returns, etc Completion of pre-emptive risk identification and assessment Assessment and response to pre-emptive risk identification and assessment by the company. Induction / Training Medical Examination (certificate of fitness and medical surveillance) Attendance at HS and Operational Meetings Over inspection / Monitoring / Auditing POST-ENGADGEMENT OPERATIONAL PHASE Review contractual performance / delivery of services Review compliance with obligations
7
Contractor Selection Phase Need for contractor employment identified Scope of work defined Evaluation criteria Tender assessment – company procedure Company actions Selection
8
Pre-engagement / Operational Phase Documentation, i.e. contract, indemnities, appointments, etc Pre-emptive risk identification & assessment Response to risk identification & assessment Induction training Medical examination (C.O.F. & medical surveillance)
9
Engagement / Operational Phase Monitoring performance, i.e.: H&S Meetings Risk management programme Occupational hygiene controls monitored Incident / injury reports Daily, weekly, monthly returns submitted First aid programme Induction Medical surveillance Health & safety training programme
10
Engagement / Operational Phase Issue & control of PPE Equipment inventory Logbooks, registers, appointments Fire drills Emergency preparedness / escape routes Vehicle / equipment pre-use checks Planned task observations H & S Audits Hazardous substances Maintenance management
11
Engagement / Operational Phase OEM training / authorisation procedure Approval of deviations / modifications to equipment Approval – temporary workers Approval – contract variation orders Non-compliances Special precautions for hazardous work
12
Post-Engagement / Project Completion Phase Review of contractual performance Delivery of service Quality assurance Review of compliance with obligations Cold commissioning of system Hot commissioning of system Warranty and maintenance period confirmed Contractor documentation Security cards returned
13
Post-Engagement / Project Completion Phase Exit medical examinations Equipment removal Site area cleared, clean & safe Acceptance of ownership
14
Common Problems experience Limitation on the number of specialist contractors in the market Time restraints in selection and appointment process Quality of contractors supervisors and employees Record keeping on the movement of contractors employees between mines Desertion of contractors employee without completing exit medical examinations
15
Future initiatives Preferred contactors list Electronic data base with program to generate tender documents
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.