Phoenix Convention Center Phoenix, Arizona Army’s Net Zero Initiative Sustainability Getting to Net Zero: Energy, Water and Waste Alicen Kandt National.

Similar presentations


Presentation on theme: "Phoenix Convention Center Phoenix, Arizona Army’s Net Zero Initiative Sustainability Getting to Net Zero: Energy, Water and Waste Alicen Kandt National."— Presentation transcript:

1 Phoenix Convention Center Phoenix, Arizona Army’s Net Zero Initiative Sustainability Getting to Net Zero: Energy, Water and Waste Alicen Kandt National Renewable Energy Laboratory August 12, 2015

2 Energy Exchange : Federal Sustainability for the Next Decade Complexities of Net Zero Water, Energy, and Waste Water, energy, and waste are interconnected in complicated ways Energy requires water to produce Water requires energy to treat and transport Waste requires energy to transport and can be used to create energy

3 Energy Exchange : Federal Sustainability for the Next Decade 1.To produce as much energy on-site as they use annually; 2.To limit the consumption of freshwater resources and return water back to the same watershed so as not to deplete the groundwater and surface water resources of that region in quantity or quality; and/or 3.To reduce, reuse, and recover solid waste streams by converting them to resource values with zero solid waste to landfill. 3 Army Net Zero Initiative

4 Energy Exchange : Federal Sustainability for the Next Decade U.S. Department of Energy (DOE) U.S. Environmental Protection Agency (EPA) U.S. General Services Administration (GSA). DOE labs, including the National Renewable Energy Lab (NREL) and the Pacific Northwest National Lab (PNNL), are providing direct support to Army Net Zero Pilot Installations. 4 Collaboration

5 Energy Exchange : Federal Sustainability for the Next Decade 5 Hierarchy http://usarmy.vo.llnwd.net/e2/c/downloads/296777.pdf

6 Energy Exchange : Federal Sustainability for the Next Decade 6 Subordinate Hierarchies http://www.asaie.army.mil/Public/ES/netzero/docs/Kingery_ISWG_17July2014-Clean.pdf

7 Energy Exchange : Federal Sustainability for the Next Decade 7 Net Zero Energy http://www.asaie.army.mil/Public/ES/netzero/docs/Kingery_ISWG_17July2014-Clean.pdf

8 Energy Exchange : Federal Sustainability for the Next Decade 8 Net Zero Waste http://www.asaie.army.mil/Public/ES/netzero/docs/Kingery_ISWG_17July2014-Clean.pdf

9 Energy Exchange : Federal Sustainability for the Next Decade Net Zero Water http://www.asaie.army.mil/Public/ES/netzero/docs/Kingery_ISWG_17July2014-Clean.pdf

10 Energy Exchange : Federal Sustainability for the Next Decade 10 Timeline FY11 Select pilot installations FY12 Develop strategies FY13 and FY 14 Project development FY15 through FY20 Program execution

11 Energy Exchange : Federal Sustainability for the Next Decade 17 Pilot Installations 11 http://usarmy.vo.llnwd.net/e2/c/downloads/296777.pdf

12 Energy Exchange : Federal Sustainability for the Next Decade 12 Net Zero Implementation Approach http://usarmy.vo.llnwd.net/e2/c/downloads/296777.pdf

13 Energy Exchange : Federal Sustainability for the Next Decade 13 Baseline/Balance Energy Table 2: Net Zero Energy Solutions Summary Table 1: U.S. Army Corps of Engineers Installation Energy Audits a and Estimated Savings http://www.nrel.gov/docs/fy14osti/60992.pdf

14 Energy Exchange : Federal Sustainability for the Next Decade 14 Baseline/Balance Water http://www.asaie.army.mil/Public/ES/netzero/docs/NZW%20Programmatic%20Summary- FINAL-10-30-13.pdf

15 Energy Exchange : Federal Sustainability for the Next Decade 15 Baseline/Balance Waste Fort Carson Mattress Recycling (PDF 344 KB) Working with a local recycler, Fort Carson no longer sends any of its mattresses to a landfill. All mattresses are taken to the recycler at no cost, and the recycler ensures all materials are recycled, re-used, and or re- purposed. Fort Carson Mattress Recycling Joint Base Lewis-McChord Composting Facility (PDF 347 KB) Joint Base Lewis-McChord (JBLM) is turning organic waste resources into valuable landscaping and soil amendment products. Joint Base Lewis-McChord Composting Facility Fort Polk Battery Reuse (PDF 285 KB) Seeing an opportunity to reduce battery expenditures, waste disposal costs and potential injury to soldiers, JRTC and Fort Polk personnel developed a program for the turn-in, testing and re-issue of these batteries. Fort Polk Battery Reuse Joint Base Lewis-McChord (JBLM) Concrete and Asphalt Recycling Success Story (PDF 192.01 KB) A one-page fact sheet about concrete and asphalt recycling at Joint Base Lewis-McChord. Joint Base Lewis-McChord (JBLM) Concrete and Asphalt Recycling Success Story

16 Energy Exchange : Federal Sustainability for the Next Decade Energy: – Conduct thermal building envelope analysis – Reduce energy use through energy management control systems – Hire resource efficiency managers – Pursue alternative financing mechanisms – Conduct energy master planning Water: – Maximize the use of xeriscaping – Implement leak detection on the potable water distribution system – Maximize water recycling – Install purple pipe – Maximize use of alternate water sources 16 Best Practices Identified

17 Energy Exchange : Federal Sustainability for the Next Decade Waste: – Establish a Qualified Recycling Program – Characterize and quantify waste flows – Improve purchasing practices to reduce waste at the source – Repurpose and reuse waste through free and low- cost opportunities – Recycle and compost waste through free and low- cost opportunities 17 Best Practices Identified

18 Energy Exchange : Federal Sustainability for the Next Decade Expand Net Zero guidelines across the board domestically Plans for extending Net Zero energy, waste, and water resource concepts to overseas facilities. – Including equipment and strategies for temporary forward operating bases and mobile maneuvers as well as permanent stationary facilities. 18 What’s Next? http://cleantechnica.com/2014/11/05/ct-exclusive-interview-army-net-zero-soldiers/

19 Energy Exchange : Federal Sustainability for the Next Decade Army Net Zero website: http://www.asaie.army.mil/Public/ES/netzero/ http://www.asaie.army.mil/Public/ES/netzero/ NREL Guide to Net Zero Energy Assessment: http://www.nrel.gov/docs/fy10osti/48876.pdf http://www.nrel.gov/docs/fy10osti/48876.pdf NREL Net Zero Energy Analysis for MCAS Miramar: http://www.nrel.gov/docs/fy11osti/47991.pdf http://www.nrel.gov/docs/fy11osti/47991.pdf Army Net Zero Energy Roadmap and Program Summary (Fiscal Year 2013): http://www.nrel.gov/docs/fy14osti/60992.pdf http://www.nrel.gov/docs/fy14osti/60992.pdf Army Net Zero Water Balance and Roadmap Programmatic Summary: http://www.asaie.army.mil/Public/ES/netzero/docs/NZ W%20Programmatic%20Summary-FINAL-10-30-13.pdf http://www.asaie.army.mil/Public/ES/netzero/docs/NZ W%20Programmatic%20Summary-FINAL-10-30-13.pdf 19 Resources


Download ppt "Phoenix Convention Center Phoenix, Arizona Army’s Net Zero Initiative Sustainability Getting to Net Zero: Energy, Water and Waste Alicen Kandt National."