Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, 2004 7:00 p.m.

Similar presentations


Presentation on theme: "Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, 2004 7:00 p.m."— Presentation transcript:

1 Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, 2004 7:00 p.m.

2 Lincoln Consolidated Schools Background Committee Make-up District Administration District Staff Community Citizens Parents

3 Lincoln Consolidated Schools Committee Tasks To Date  May 20, 2004  August 11, 2004  August 30, 2004  September 16, 2004  October 12, 2004 April 21, 2004 June 16, 2004 August 24, 2004 September 7, 2004 October 5, 2004 Meetings Community Survey (Focus Group) Studied Enrollment Projections

4 Lincoln Consolidated Schools Grades K-5 Enrollment Projection/Capacity

5 Lincoln Consolidated Schools Grades 6-8 Enrollment Projection/Capacity

6 Lincoln Consolidated Schools Grades 9-12 Enrollment Projection/Capacity

7 Lincoln Consolidated Schools Grades K-12 Enrollment Projection/Capacity

8 Lincoln Consolidated Schools Guiding Principles Solution should cover Enrollment relief at all grade levels, and make the Schools feel smaller in size (i.e., school within a school) 1. Should be a long-term solution and should provide flexibility for the future 2. Solutions should create a positive image for the District, Solution should maintain a feeling of community spirit, and Solution should have a clear and measurable benefit 3. Additions and remodeling should be based on "sound" educational reasoning 4. Note: Last two items were a tie in ranking. State of Art Technologies 5. Solution should be attainable in the public's opinion

9 Lincoln Consolidated Schools Final Draft Recommendations Construct new High School on current site north of middle school and south of Childs for 2,000 students with capacity of the core space to be 2,500 including outdoor fields. High School project includes an Auditorium for 1,000 seats with full fly and supporting space (approx. 36,000 sq. ft.) High School project includes an 8 lane x 25 yard competition pool with integral diving well and supporting spaces (approx. 25,000 sf) New High School Renovate Bessie Hoffman into Alternative Education Center Allocate $3M for technology District Wide Other Secondary Issues

10 Lincoln Consolidated Schools Remodel classroom to Tech Program rooms “Gas, Air, Water at Perimeter” above floor New Casework Remodel 2 classrooms to Science Ready Rooms “Gas, Air, Water at Perimeter” above floor New Casework Major Remodeling Bessie Hoffman

11 Lincoln Consolidated Schools Move Middle School to existing High School and form 2 middle schools – East & West (Capacity – 1,600) Final Draft Recommendations Middle School

12 Lincoln Consolidated Schools East Wing – Major Remodel 6 classrooms to Science Ready Rooms “Gas, Air, Water at Perimeter” Above Floor New Casework West Wing – Major Remodel 2 classrooms to Science Ready Rooms “Gas, Air, Water at Perimeter” Above Floor New Casework West Wing – Major Remodel 4 classrooms to Science Ready Rooms “Gas, Air, Water at Perimeter” Above Floor New Casework West Wing – Major Remodel Remodel existing pool to accommodate barrier free issues (auto-raising bottom) West Wing – Minor Remodel Remodel original music room suite to new Music Classrooms (storage use now) 8 th Grade 7 th Grade 6 th Grade West Wing – Minor Remodel Remodel facility’s offices to West Wing Administration Area

13 Lincoln Consolidated Schools Final Draft Recommendations Elementary Schools Renovate middle school to elementary housing:  multi-age program from Bessie Hoffman  an elementary school the size of Childs  renovate outdoor areas for elementary playgrounds Roofing Replacement at Model Elementary Reconfigure elementary program to K-5 Remodeling at Redner for additional Kindergarten classes Abatement / ADA Upgrades at Brick Elementary

14 Lincoln Consolidated Schools Remove existing computer labs to enlarge Media Center & create Art Room Modify finishes, lighting, HVC Supplement Media Center furnishings Major Remodeling Minor Remodeling Spare Comp SE 2-3 4-5 2-3 4-5 T K-1 Spare 3 3 4 4 Comp SE 5 5 Spare 2 2 1 1 SE T 2 2 1 1 Spare 5 5 T Parent 3 3 4 4 K Comp K K Admin K Remodel 12 classrooms to become 8 Kindergarten classrooms Modify finishes and doorways New casework; add water Remodel 2 classrooms to become Multi-Age Administration Modify finishes and doorways New casework; modify HVAC Allows for flexibility of ½ day or all day kindergarten.

15 Lincoln Consolidated Schools Redner Elementary Minor Remodeling Remodel 4 classrooms to become 3 Kindergarten classrooms Modify finishes and doorways New casework; add water

16 Lincoln Consolidated Schools Allocate $2M of bond dollars toward purchase of future land Final Draft Recommendations Other Final cost of February 2005 bond issue $95 M =.90 mills $2.1 M =Projected Interest Earnings $97.1 M Total Project Budget

17 Lincoln Consolidated Schools Adjustments since Draft Presentation After receiving information from the Community Survey and Public Forum, the Citizens Steering Committee felt it necessary to conceptually include the walking track in the gymnasium for the New High School. Administration and Board Members on the Committee agreed that this would be a good response to input received from the community survey and public forum. New High School Elementary Projects It was also concluded that partial “All Day” kindergarten could be achieved at Childs Elementary by the relocation of one Special Ed classroom to an underutilized existing resource room, eliminating the necessity for the planned addition. Bond allocated monies for the proposed two kindergarten classroom addition will be reallocated to the New High School. Administration and Board Members on the Committee agreed that this would be a good response to input received from the community survey and public forum. The District Building and Site Committee has been formulating a list of “Future Projects”. The District Administration has identified some projects from the “Future Projects List” as “Must Do” from the 2005 Bond Issue budget. This includes partial roof replacement at Model Elementary, and abatement / ADA upgrades at Brick Elementary.

18 Lincoln Consolidated Schools Summary Convert Existing HS into 2 - 800 Student MS Convert Bessie Hoffman to Alternative Ed Convert Existing MS into (2) Elementary Schools Roof replacement at Model Remodel Redner Classrooms for Kindergarten Build New 2000 Student (2500 Core) High School Property Acquisition District Wide Technology Abatement / ADA Upgrades at Brick

19 Lincoln Consolidated Schools Next Steps Board of Education Approval of Recommendation on scope of project – October 18, 2004 Department of Treasury Approval Process Board of Education Action to Schedule Election November 29, 2004 Organize Bond Campaign Committees Board of Education Approval of Preliminary Qualification Application – October 25, 2004

20 Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation October 18, 2004 7:00 p.m.


Download ppt "Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, 2004 7:00 p.m."

Similar presentations


Ads by Google