Download presentation
Presentation is loading. Please wait.
Published byPhoebe McDonald Modified over 9 years ago
1
Luminance
2
Major group refactoring. Development Lead: Stephen Damm. Project Manager: Martina Nagy. Test team member: Chet Collins. A lot of effort and cooperation to get new team configuration organized. Met with professor. Talked through it as a group. But we’re still developing strong.
3
Puzzle game Guide a beam of light using a limited set of tools to certain goals avoiding obstacles along the way. Previous milestone Focused on setup/research Examining the previous system Current milestone Focused on development Majority of work has been developing the different components of the game
4
Resource Manager Textures, Sounds, Music Input Touch, Drag GUI Menu primitives Level Loader XML Graphics Basic primitives (sphere, box, etc.) Game Renders grid, background, game objects
7
Strategy for testing When dev’s commit code stubs, inform test team Gone to external sources for advice Ant scripts vs. IDE Results so far Continuous integration working. Game State testing – assume OpenGL is correct. Use case scenarios – GUI Tests. User Evaluation plan.
8
ResourceManager. jUnit. Use case testing. GUI. Black box. For every class in the system. Smoke test Guarantees repository has run able code
9
Description General communication issues amongst the sub groups. Probability: Low Severity: High Plan: Adjust roles to be clear and precise. Additional weekly meetings dedicated to sub groups sharing their progress. Status: Occurred, solved.
10
Description Losing a team member. Probability: Low Severity: Low Plan: Shuffle around people to fill the lost roles. Status: Occurred, solved.
11
Description The game we envision cannot achieve the performance required. Probability: Medium Severity: High Plan: Lower texture quality, reduce special effects, smaller levels. Explore any android specific optimizations. Profile our code for hot spots. Status: NULL.
12
Code Reviews Individual Peer Smoke Test Guarantees run able game Build master Ensures code quality Reviews days work
13
Android/Java Caveats No abusing memory allocations ▪ Memory limit: 24MB ▪ Avoid ‘new’ anywhere in update() or draw() code paths Turning off the garbage collector ▪ Call manually as we see fit ▪ Cannot let it run wild Java loves threads: ▪ main thread, event thread, android thread ▪ OpenGL context only valid and accessible in android thread
14
Version Control Strategy. Essentially remained the same. ▪ TeamCity + Google Code. Developers commit stubbed classes. ▪ Including pre-conditions, post-conditions, parameter explanations, etc. Test team is able to start writing unit tests on this stubbed out code. End result: Software development process more efficient.
15
Enhanced communication. Discuss as a group what changes are going to be made. Enhanced collaboration. Separate team meetings for specific discussions, then regroup. Improved division of labour. No longer relying on one person to do it all.
16
Improved chain of command. More defined developer lead position and project manager positions. Enforcing group understanding of system. OpenGL tutorial conducted by Stephen. Game oriented testing. Challenges of game testing. Focus is on black box / play testing. Tests written as code stubs are created.
17
Milestone 3: Game level editor. GUI Test suite. Design user evaluation questionnaire. Finalize the in game object models. Implement special effects, sound effects. Milestone 4: Discuss changes to game based on evaluation. Prototype and implement new in game puzzle tools and game puzzle mechanics. Outline and design user manual. Implement random level generator. Beta version of the game. Milestone 5: Clear out all known bugs. Play test. Release version of game. Post Mort-um document. Push game through Q&A process.
18
The end!