Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011.

Similar presentations


Presentation on theme: "Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011."— Presentation transcript:

1

2 Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011

3 20 April 20143 Introduction Magnox Limited, the NDA and EnergySolutions What are we doing? Magnox Optimised Decommissioning Plan (MODP) Integrated Waste Strategy Stakeholder Engagement

4 20 April 20144 Magnox Limited, the NDA and EnergySolutions 100% Owned Parent Body Agreement M&O Contract Magnox Limited NDA EnergySolutions EU Ltd

5 20 April 20145 What are we doing? Maximise the value of safe electricity generation at 2 sites Defuelling at 3 sites Acceleration of decommissioning at 2 sites Optimise decommissioning at 3 sites Reshape the workforce in partnership with the TUs

6 20 April 20146 Magnox Optimised Decommissioning Plan Wylfa TrawsfynyddHunterston A Hinkley Point A Chapelcross Sizewell ABradwell BerkeleyOldbury Dungeness A

7 20 April 20147 Integrated Waste Strategy Very Low-level waste (VLLW) Low-level waste (LLW) Intermediate-level waste (ILW) Metals Oils Mini-stores Asset value and cross-estate working Programmisation

8 20 April 20148 Stakeholder Engagement Site Stakeholder Groups The way we engage –Cooling towers Skills for the UK –EdF/Magnox Limited agreement Sustainability –The Energy Island; Beyond Chapelcross Partnership with local communities

9 20 April 20149 Summary Working as a strategic delivery partner for the NDA Bringing the UK Magnox programme to a dignified end Clarity of work for each of the Magnox sites Delivering the customers waste strategy Engaging with stakeholders and in partnership with our workforce


Download ppt "Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011."