Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011
3
20 April 20143 Introduction Magnox Limited, the NDA and EnergySolutions What are we doing? Magnox Optimised Decommissioning Plan (MODP) Integrated Waste Strategy Stakeholder Engagement
4
20 April 20144 Magnox Limited, the NDA and EnergySolutions 100% Owned Parent Body Agreement M&O Contract Magnox Limited NDA EnergySolutions EU Ltd
5
20 April 20145 What are we doing? Maximise the value of safe electricity generation at 2 sites Defuelling at 3 sites Acceleration of decommissioning at 2 sites Optimise decommissioning at 3 sites Reshape the workforce in partnership with the TUs
6
20 April 20146 Magnox Optimised Decommissioning Plan Wylfa TrawsfynyddHunterston A Hinkley Point A Chapelcross Sizewell ABradwell BerkeleyOldbury Dungeness A
7
20 April 20147 Integrated Waste Strategy Very Low-level waste (VLLW) Low-level waste (LLW) Intermediate-level waste (ILW) Metals Oils Mini-stores Asset value and cross-estate working Programmisation
8
20 April 20148 Stakeholder Engagement Site Stakeholder Groups The way we engage –Cooling towers Skills for the UK –EdF/Magnox Limited agreement Sustainability –The Energy Island; Beyond Chapelcross Partnership with local communities
9
20 April 20149 Summary Working as a strategic delivery partner for the NDA Bringing the UK Magnox programme to a dignified end Clarity of work for each of the Magnox sites Delivering the customers waste strategy Engaging with stakeholders and in partnership with our workforce