Download presentation
Presentation is loading. Please wait.
Published byBertram Palmer Modified over 9 years ago
1
Quality Strategy June 10, 2009 Presented by: Debby McNamara, LCSW, PMP Quality Coordinator, AHCA
2
Performance Improvement Projects Question & Answer Session Wednesday, June 10, 2009
3
Did you know…? The Frequently Asked Questions for PIPs on the myfloridaeqro.com Web site has been updated as of May, 2009. Your final 2008-9 PIP Validation Reports have been posted to your folder on the HSAG FTP site. You can schedule technical assistance by contacting Denise Driscoll at ddriscoll@hsag.com. ddriscoll@hsag.com
4
Did you know…? The same process from the past two years will be used for the submission of PIPs for 2009- 2010. CMS is reviewing all the protocols over the next six months and changes may be occurring. HSAG is investigating the feasibility of moving the PIP Summary Forms to a Web based submission process for 2010-2011. The collaborative call schedule has been posted.
5
Any Questions?
6
EQR Quarterly Meeting Overview of Current Activities and Upcoming EQR Activities June 10, 2009 Presented by: Gretchen Thompson, MBA, CPHQ Executive Director, State & Corporate Services
7
Current EQR Activities Overview of activities conducted during state fiscal year 2008-2009
8
Current EQR Activities Performance Improvement Projects (PIPs) Completed validation of two PIPs per MCO Produced the Annual PIP Validation Summary Report Draft Annual Strategic Report for Performance Improvement Projects is due to AHCA on June 30, 2009 Technical assistance activities with MCOs, AHCA, and DOEA - ongoing
9
Current EQR Activities Validation of Performance Measures Completed validation of performance measures reported by HMOs and PSNs (Reform and Non-Reform), PMHPs, CWPMHP and NHDPs Produced and finalized Annual Validation of Performance Measures report and MCO specific findings Produced and finalized MCO-specific Validation of Performance Measure reports for PMHPs and NHDPs
10
Current EQR Activities Validation of Performance Measures PMHP initial validation activities are underway for the new cycle
11
Current EQR Activities Monitoring of MCO Contract Compliance Working with AHCA and DOEA to finalize monitoring tools and database –PMHP database tool operational (includes CW-PMHP) –Tool development to occur for NHDP, PSN, and HMOs once FY 2010 contracts are finalized Focused reviews continuing
12
Current EQR Activities Strategic HEDIS ® Analysis Produced and finalized HEDIS 2008 Strategic Analysis Report on Reform and Non-reform HMOs and PSNs HEDIS is a registered trademark of the National Committee for Quality Assurance (NCQA)
13
Current EQR Activities Technical Assistance in Other Areas Provided technical assistance as needed Produced quarterly reports on technical assistance activities provided during the year and status of recommendations
14
Current EQR Activities Dissemination and Education Conducted four quarterly meetings during the fiscal year Conducted one-on-one technical assistance sessions Maintained myfloridaeqro.com website Weekly communications with AHCA, monthly progress reports
15
Current EQR Activities EQR Technical Report Internal analysis underway Draft report due to AHCA in July, 2009
16
Year Four EQR Activities Overview of activities to be conducted during state fiscal year 2009-2010
17
Year Four EQR Activities Validation of PIPs Validation of performance measures Review of compliance with access, structural, and operations standards Strategic HEDIS ® analysis reports Technical assistance Dissemination of EQR information EQRO Technical Report
18
Year Four EQR Activities MARK YOUR CALENDARS!!!! The next EQR Quarterly Meetings are scheduled for: Wednesday, September 23, 2009 (Webinar) Wednesday, January 13, 2010 (AHCA Offices) One-on-One TA sessions Tuesday, January 12, 2010 Wednesday, March 24, 2010 (Webinar) Wednesday, June 9, 2010 (AHCA Offices) One-on-One TA sessions Tuesday, June 8, 2010
19
MCO Roles and Responsibilities related to Year Four EQR Activities (FY 09-10)
20
MCO Roles and Responsibilities Validation of Performance Improvement Projects
21
Validation of PIPs MCO Roles and Responsibilities Provide basic information on the PIPs that are currently underway (Statement of Intent) Complete the PIP Summary Form and provide supportive documentation for each PIP selected for validation Review HSAG’s completed PIP Validation Tool and address any Points of Clarification, Partially Met and Not Met evaluation elements
22
Validation of PIPs MCO Roles and Responsibilities Continuing Collaborative PIP activities –Participate in quarterly conference calls –Facilitate at least one quarterly conference call (with HSAG support) New Collaborative PIP activities (for NHDPs) –Monthly conference calls –Facilitate at least one monthly conference call (with HSAG support)
23
Validation of PIPs MCO Roles and Responsibilities Participate in the Collaborative PIP activities –Conduct key activities of the PIP following the study design –Implement interventions –Collect and analyze two annual re- measurements
24
Project Activity by Month Validation of Performance Improvement Projects (PIPs) Task MayJunJulAugSepOctNovDecJan 10 FebMarAprMayJun PIPs 7/09 – 9/09 Statement of Intent Requested 10/09 – 12/09 Perform Individual PIP Reviews 01/10 – 2/10 Prepare Annual Validation Summary Report 03/10 – 04/10 Prepare Annual Strategic Report Ongoing Collaborative PIP Activities and Technical Assistance 10/09 MCOs Submit PIP Forms
25
MCO Roles and Responsibilities Validation of Performance Measures
26
Validation of Performance Measures MCO Roles and Responsibilities Both non-reform and reform HMOs and PSNs provide 2009 HEDIS ® RoadMap (HEDIS Record of Administration, Data Management and Processes) HMOs and PSNs complete and forward supplemental questions document to HSAG Establish a contact person if questions arise from the HSAG review team
27
Validation of Performance Measures MCO Roles and Responsibilities PMHPs complete Information Systems Capabilities Assessment Tool (ISCAT), source code, and when produced, performance measure rates for selected measures. Prepare for and participate in HSAG’s site visit (May – June annually) and post onsite audit activities.
28
Validation of Performance Measures MCO Roles and Responsibilities NHDPs complete Information Systems Capabilities Assessment Tool (ISCAT), source code, and when produced, performance measure rates for selected measures. Prepare for and participate in HSAG’s site visit (Oct – Nov annually) and post onsite audit activities.
29
Project Activity by Month Validation of Performance Measures (PMVs) HMOs/PSNs (Reform and Non-Reform) Task MayJunJulAugSepOctNovDecJan 10 FebMarAprMay PMVs HMOs & PSNs 11/09 – 1/10 Prepare Report 10/09-11/09 Receive MCO documentation 9/09 Request Documentation Ongoing TA to AHCA/DOEA for Performance Measures
30
Project Activity by Month Validation of Performance Measures (PMVs) PMHPs Task MayJunJulAugSepOctNovDecJan 10 FebMarAprMay PMVs PMHPs 6/09 – 7/09 Prepare Report, Review Final Rates 08/09 Finalize PMV Reports 5/09-6/09 Site Visits Ongoing TA to AHCA/DOEA for Performance Measures 03/10 Request ISCAT documentation 05/10 Receive ISCAT documentation
31
Project Activity by Month Validation of Performance Measures (PMVs) NHDPs Task MayJunJulAugSepOctNovDecJan 10 FebMarAprMay PMVs NHDPs 12/09 – 1/10 Prepare Report, Review Final Rates 02/10 Finalize PMV Reports 10/09-11/09 Site Visits Ongoing TA to AHCA/DOEA for Performance Measures 08/09 Request ISCAT documentation 09/09 Receive ISCAT documentation
32
THANK YOU FOR YOUR PARTICIPATION!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.