Download presentation
Presentation is loading. Please wait.
3
IDEA AND DESIGN
4
IMPLEMENTATION AND OPERATION
8
1 kW wind turbine
9
Polycrystalline PV panels (2x100 Wp) Inverter (2.5 kW ) Solar Charger (40 Amp) Batteries (12V 100 A )
10
Flat plate collector (2m 2 ) Hot Water Tank (100 liter) Solar station
11
8 kW Biomass Pellets Stove
12
Meteo Station Clean energy trainer - Heliocentris
13
Audio Visual Equipment Books and magazines Laptop and printer
14
LAUNCHING – DECEMBER 2012
15
ACTIVITIES School visits University open house Community events
16
FUTURE PLANS Establishment of a long term agreement with the ministry of education. Participation to the Green Demonstration Room in Jounieh Refining the existing 3 level presentation program. Recruitment and training of new presentation team members.
17
SPONSORSHIPS AND CONTRIBUTIONS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.