Download presentation
Presentation is loading. Please wait.
Published byLorin Nicholson Modified over 9 years ago
1
1 Status and Plans DCS workshop 16.9 2002 L.Jirdén u Budget u Status u Planning u Goals for end 2002
2
2 DCS budgeting u Total DCS budgets in MOU very approximate u Old and incomplete figures u Not clear what they cover u Update requested in each URD u No answers yet… u Simple excel form to complete u Two distinct partitions: u Detector DCS costs u Central DCS costs u Spending profile also needed
3
3 FC TOF … ~ 100 sub- systems 2-300 device units 2-300 physical devices SPDSDDSSD TPCTRD TRATRI ZDCPMDFDPHOHMP CPV EMC ROFMDCAL ITSMU V0T0 DET ……… … … … … MAG DCS DSSINFGAS ECS COS > 10 5 channels > 10 6 parameters Budgeting guidelines ~ 19 sub- detectors Detectors & services
4
4 FC TOF … ~ 100 sub- systems 2-300 device units 2-300 physical devices SPDSDDSSD TPCTRD TRATRI ZDCPMDFDPHOHMP CPV EMC ROFMDCAL ITSMU V0T0 DET ……… … … … … MAG DCS DSSINFGAS ECS COS > 10 5 channels > 10 6 parameters Budgeting guidelines ~ 19 sub- detectors Detectors & services Central DCS Detector DCS
5
5 Experimental equipment LAN WAN Storage Other systems (LHC, Safety,...) Configuration DB, Archives, Log files, etc. Controller/ PLC VME Field Bus LAN Node Budgeting guidelines
6
6 Experimental equipment LAN WAN Storage Other systems (LHC, Safety,...) Configuration DB, Archives, Log files, etc. Controller/ PLC VME Field Bus LAN Node Detector DCS Central DCS
7
7 Budgeting table
8
8 TPC DCS Cost example
9
9 MAG DETECTOR URD status Sept 02 DET DCS DSSINFGAS ECS OFFTRGDAQLHC draft URD exists Discussion started Not started
10
10 MAG INFRASTR. URD status Sept 02 DET DCS DSSINFGAS ECS OFFTRGDAQLHC draft URD exists Discussion started Not started ENV. PARAM Subsystems CRTERACKPRIM ELECTRALIGN LANFB NETW PLNTPRIM COOLACCES GAS SXL2 SXL1 ACR CR1 CR2 CR3 CR4 UX
11
11 MAG GAS URD status Sept 02 DET DCS DSSINFGAS ECS OFFTRGDAQLHC draft URD exists Discussion started Not started … TOFTRDPMDHMP FC TPC RO PHO CPVCALTRATRI MU Detectors Modules MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS
12
12 MAG DETECTOR Proto status Sept 02 DET DCS DSSINFGAS ECS OFFTRGDAQLHC exists started Not started
13
13 MAG INFRASTR. Proto status Sept 02 DET DCS DSSINFGAS ECS OFFTRGDAQLHC exists started Not started ENV. PARAM Subsystems CRTERACKPRIM ELECTRALIGN LANFB NETW PLNTPRIM COOLACCES GAS SXL2 SXL1 ACR CR1 CR2 CR3 CR4 UX
14
14 MAG GAS Proto status Sept 02 DET DCS DSSINFGAS ECS OFFTRGDAQLHC exists started Not started … TOFTRDPMDHMP FC TPC RO PHO CPVCALTRATRI MU Detectors Modules MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS MIX PUR PMP ANA DIS
15
15 MAG DETECTOR SUB- SYSTEMS DET DCS DSSINFGAS ECS OFFTRGDAQLHC Detectors subsystems … FC TOF SPDSDDSSD TPCTRDZDCPMDHMPEMC RO ITS PHO CPVCAL FD FMDV0T0TRATRI MU COS LSR HV2 LV2 COO 2 GAS FEE TS HV1 LV4 COO B FEE HV2 LV2 COO B GAS FEE HV1 LV? COO B GAS FEE HV1 LV3 COO 1 FEE HV1 LV1 COO B FEE COO 2 ROD HV3HV1 LV2 COO B GAS FEE HV1 LV? COO B FEE ? HV1 LV? COO 3 FEE ? HV1 LV? COO ? FEE ? HV1 LV? COO B GAS FEE ? HV1 LV2 FEE ? HV1 LV2 COO B GAS FEE HV4 LV? COO ? GAS FEE ? HV1 LV2 FEE ? HV1 LV2 FEE ? HV? LV? FEE ? GAS LIQ GAS HV1 LV2 COO B GAS FEE ALITS
16
16 DCS Planning u Global DCS planning exists
17
17 DCS Planning 20020304050607 FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE SUB-DET CONTR. INSTALL DETECTOR DCS INSTALL DCS INFRASTRUCTURE TEST WITH DETECTOR EQUIPMENT
18
18 DCS Planning u Global DCS planning exists u Individual detector DCS planning missing u Input asked in each URD u Not many answers yet… u To start: u Simple Milestones list in excel form to complete u Then: u Microsoft project planning file
19
19 Milestones u User Requirements Document (URD) u Lab setup u Individual sub-system u Connection to PVSS, some panels, limited logging and configuration facilities u Intermediate detector tests & test beams u A few sub-systems involved u Subsystem as finite state machine u Pre-installation tests u All sub-systems involved u Extended logging, configuration and alarm facilities u Detector as finite state machine u ECS and liaisons with DAQ, TRG u Final installation u Commissioning
20
20 TPC Milestones ex. HVLVCOLA… u URD Jan 02Jan 02Mar 02Jun 02… u Lab setup Apr 02May 02Jun 02?… u detector tests Mar 03Mar 03Mar 03? u Pre-inst. Tests Apr 04Apr 04Apr 04? u Final installation Jun 05Jun 05Jun 05? u Commissioning Sep 06Sep 06Sep 06Sep 06
21
21
22
22
23
23
24
24 Goals for end 2002 u URD’s u A 1 st version from all remaining detectors u Existing URD’s updated to cover u All sub-systems u Operational requirements: state/transition diagrams u for sub-systems u For ECS: exp. Modes and actions for DCS, DAQ, TRG u Interlocks u Planning: milestones table u Budget: Central DCS and Detector DCS estimate
25
25 Goals for end 2002 u Prototyping u Common solutions (ACC team) u CAEN 1527 available in PVSS FW + lab setup u ISEG HV available in PVSS FW + lab setup u Wiener PL500 available in PVSS FW + lab setup u 1 st proto Temp monitoring system + lab setup u Detectors u Start using PVSS FW and one common solution u Make a Lab Setup
26
26 Conclusion u URD’s are advancing well – 2 nd version now needed u Prototyping is just starting u DCS to be ready for each detector in less than 3 years (mid 05) u A realistic planning of these 3 years is essential u Detector tests to be used as milestones for the DCS planning u Intermediate steps to be detailed for each sub-system
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.