Presentation is loading. Please wait.

Presentation is loading. Please wait.

Joint Operations Command Australian Presentation ACGU Working Group UNCLASSIFIED Allan Deacon JCTC.

Similar presentations


Presentation on theme: "Joint Operations Command Australian Presentation ACGU Working Group UNCLASSIFIED Allan Deacon JCTC."— Presentation transcript:

1 Joint Operations Command Australian Presentation ACGU Working Group UNCLASSIFIED Allan Deacon JCTC

2 Joint Operations Command Scope  Management –CDF Guidance –MOU: Persistent, ITAR –FMS Case –Exercise classification –Mission network  Technical –Navy initiative –Non 4E nations –DTEN and CFBL –CX-I TF Urban Operations Training Facility Shoal Water Bay

3 Joint Operations Command Management – CDF Guidance  Chief of the Defence Force –Grow JCTC –Joint Collective Training Centre –DTEN as the single simulation network –Align DTEN and CFBL networks –Amphibious capability –US Troops in Australia –Pacific focus –Multi-lateral operations Australian LHD ships

4 Joint Operations Command Management – Technical Growth DJCTC (J77) LTCOL Fred Cobain SYSTEMS MGR (J776) Allan Deacon Sim Technician Ric Bulluss Sim Systems Lead Darren Ward Security & Accreditation Mick Carruthers MIS Lead Paul Vohradsky Network Lead Geoff Scougall Senior MIS Tech Josh McDougall MIS Tech Anthony Lowe Senior Sim Tech Brad Walton Sim Tech Greg Quilliam Senior Network Tech Shaun Williamson Network Tech Evan Wain Network Tech Shaun Moran Sim Tech Jaan Liiband MIS Tech Ben Kuliffay MIS Tech Ross Mavor Network Tech Peter Francis Network Tech Luke O’Hare Sim Tech Rob Davidson Sim Tech Bevan Fairleigh Sys Engineer Jimmy Wong Constructive Sim From 1 May 12 Constructive Sim From 1 May 12 Web Developer From 1 May 12

5 Joint Operations Command Management – JCTC MOU  Persistent Connection –DSAWG 13 March 2012 –DTEN-JTEN 24/7 –Ports & Protocols pre defined  ITAR –Contractor access to controlled software & hardware –Not covered in MOU –Interim using CVF TAA SIPR JTEN DTEN DSN

6 Joint Operations Command Management – FMS Case  Covers –Access to software (JCATS, JLOD, JTDS, JSPA) –Software training and maintenance –Funding of US personnel to Aus –ACGU services  Status –Mar 12: Expect US signed LOA –Apr 12: Expect stamped FMS Case –May 12: JCW site visit to JCTC –By 30 Jun 12: Software received

7 Joint Operations Command Management – Ex Classification  Security Options –Network multiple releasabilities, guard protected –Separate network enclave  Considerations –Releasable only to participants? –MOU in place to cover exchange? DTEN NCTE

8 Joint Operations Command Generic mission training network Operation X Mission network Operation X Msn Trg network Operation Y Mission network Operation Y Msn Trg network Op XOp Y Management - Mission Network

9 Joint Operations Command Technical – Navy Initiative Simpson Trunk PACOM DTEN HMAS Watson ACGU NCTE JTEN Canada United Kingdom 4E Parametric  ACGU Enclave  JLVC and NCTE  FOM alignment

10 Joint Operations Command Technical – Non 4E Simpson Trunk PACOM DTEN ACGU NCTE JTEN 1.Separate Enclave 2.Individual Guard 3.Shared Guards 3E 1. 2. 1,2,3. 3.

11 Joint Operations Command Technical – DTEN & CFBL DTEN-R DRN DSN 4E 3E 3DES DTEN-S

12 Joint Operations Command JTEN DTEN CXI-TF CXI Enoggera Canberra Townsville  In-country enclave  Admin rights  DTEN-JTEN link Technical – CX-I TF

13 Joint Operations Command Questions UNCLASSIFIED ACGU Australian Brief


Download ppt "Joint Operations Command Australian Presentation ACGU Working Group UNCLASSIFIED Allan Deacon JCTC."

Similar presentations


Ads by Google