Opportunities and challenges in floating wind Eirik Byklum – 27 November 2012
2
Foundations for floating wind Spar buoys From 100 m water depth Hywind Demo (2009) Semi-submersibles From 40 m water depth WindFloat Demo (2011) Tension leg floaters From 60 m water depth Scale test under planning Classification: Internal 2012-03-132
3
Installation Bottom-fixed foundations Offshore installation of foundation Offshore installation of WTG Offshore commisioning Floating foundations Inshore assembly Tow-out of complete unit Large part of commisioning onshore Classification: Internal 2012-03-133
4
Environment Bottom-fixed foundations Piling noise during installation Often in sight from land Larger seabed footprint Floating foundations No piling needed Can be placed out of sight Smaller seabed footpring Classification: Internal 2012-03-134
5
Fabrication and technology Bottom-fixed foundations Adaption needed for each unit Proven technology Floating foundations Standardized, mass production Less mature technology, need pilots Classification: Internal 2012-03-135
6
Cost reduction pathway
7
Main cost reduction areas for floating wind Concept development Upscaling Design optimization Mooring systems Cost-efficient fabrication Fabrication friendly design Efficient mass production Assembly and installation Efficient installation vessels Onshore assembly
8
Conclusions Large offshore wind resources located in deep waters Floating wind has advantages in terms of fabrication, installation and environment Currently higher CAPEX, but cost-competitive in the future
9
Eirik Byklum Technology Manager Floating Wind ebyk@statoil.com www.statoil.com