Download presentation
Presentation is loading. Please wait.
Published byDorothy Gray Modified over 9 years ago
1
CJK Meeting Report Aug. 29, 2003 Kazunori Konishi
2
CJK Meeting Agenda 1.Shinji Ogawa @NASDA: "Wideband Internet Satellite - WINDS“ 2.Hang Ryeol Na @KISDI: "Necessity of Advanced Network between China and Korea“ 3.Yim Kwok Weng Gant @C2C: "C2C Cable Network“ 4.Xing Li @APAN-CN: "APAN-CN Updates“ 5.Shuji Shimizu @ Kyushu-U: “Telemedicine for cancer patient“ 6.Shigeki Goto & Kazunori Konishi @APAN-JP: "Joint Research Projects between China and Japan“
3
Summary Demand of Gigabit JP-CN link should be clarified, and Proposal of Joint Research Projects between China and Japan should be submitted to sec-jp@jp.apan.net.sec-jp@jp.apan.net Over provisioning by DWDM will help APAN expand the bandwidth; we should develop high performance applications. NASDA’s Wideband Internet Satellite (WINDS) was explained.
4
Wideband Internetworking Engineering Test and Demonstration Satellite (WINDS) has following goals; ● Ultra High Speed Satellite Communication 155Mbps downlink for home use with USAT(45cmφ) 1.2Gbps duplex link for company use ● Wide Area Coverage for Asia-Pacific Area Data Rate coverage Present Communication Satellite Wide-area Communicati on Regional Multicasting Communication Multi Beam Antenna/ Multi Port Amplifier Active Phased Array Antenna wide high low narrow Goal of WINDS program
5
Korea – Europe Research Collaborations Government funding for international research collaborations using advanced networks such as APII, TEIN, etc. since 2001 –Policy dilemma: physical network(s) provided free of charge Funding for research activities too? In case of the year 2003, KISDI received 17 applications and finally selected 6 projects for TEIN
6
STM-16(2.5Gbps) over C2C Cable Network Wavelength Converter Muxponder TYCO SLTE TYCO SLTE FJT DWDM TYCO SLTE FJT DWDM Wavelength Converter TYCO SLTE Tanshui CS Chung Hom Kok CS Chaiwan CH Nanhui CS Pusan CS Shima CS KDDI SLTE FJT DWDM KDDI SLTE Chikura CS KDDI SLTE TYCO SLTE Nasugbu CS FJT DWDM Muxponder Tokyo CH 2 x STM-16 TYCO SLTE TYCO SLTE TYCO SLTE TYCO SLTE Working path (STM-16) Protection path (STM-16)
7
Live surgery be extended to China Aug 22, 2003
8
Project Proposal - Word File of 1 page Title of the project: Institutions –Japan: –China: Bandwidth required: Abstract including a figure Expected results with schedule Contacts: –Japan: –China
9
Schedule (draft) 8/27 Kick off 9/12 Deadline of the proposal email: sec-jp@jp.apan.netsec-jp@jp.apan.net 9/25 Meeting in HK 9/29 Submit the Joint Projects to our government
10
Presentation Materials Have been uploaded at www.jp.apan.net Busan Meetingwww.jp.apan.net
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.