Presentation is loading. Please wait.

Presentation is loading. Please wait.

Marriott Corporate Headquarters

Similar presentations


Presentation on theme: "Marriott Corporate Headquarters"— Presentation transcript:

1 Marriott Corporate Headquarters
John Henderson Marriott Corporation

2 Marriott Headquarters
1977 construction of ~700,000 square feet 1986 addition of ~300,000 square feet 8 floors including basement Office space operates 7 am to 6:30 pm Many areas at ~10% operation 24 hours a day, 7 days a week

3 Marriott Headquarters HVAC & Lighting Equipment in 1989
One 900 ton & one 750 ton electric centrifugal R-11 refrigerant, 0.86 & 0.92 kW/ton efficiencies installed in 1977 with original building construction Two 450 ton chillers, 0.62 kW/ton, R-11, circa 1986 Two 1000 ton cooling towers Two 350 horsepower gas boilers, 175°F hot water ~12,000 fluorescent fixtures, two 40 watt U-tubes each ~1800 assorted incandescent lamps & spots

4 Marriott Headquarters Project Scenario
boiler room Virtually no maintenance since 1977 Half of plant didn’t work Parts leaked, made noise Not meeting safety requirements Not providing building comfort

5 Marriott Headquarters “Before” Pictures
air handler unit sample motor

6 Marriott Headquarters Project Challenges
Everything needed attention at once Large budget for the wrong things Set strenuous daily goals Conserved energy wherever possible Considered many new systems Most work and analysis done in-house

7 Marriott Headquarters System Solutions
Short term, through 1994 cleaned up boiler room rehabbed equipment - motors, boilers, piping, air handlers, etc. converted all chillers to R-123 increased cooling tower capacities to 1200 tons added heat exchanger for free cooling put electronic ballasts in lighting fixtures

8 Marriott Headquarters System Solutions
Long term, 1994 until today two new traditional chillers, an ice chiller and a gas/oil absorber redesigned chilled water piping for more effective primary/secondary loops added window films extensive rebalancing of air handlers new motors added new control system added

9 Marriott Headquarters Variety of New Chillers
One 670 ton electric centrifugal chiller replaced 900 ton chiller 0.53 kW/ton efficiency, R-123 refrigerant One 530 ton combination gas/oil-fueled absorber replaces 750 ton chiller, used for peak shaving

10 Marriott Headquarters Variety of New Chillers
One ice chiller and storage system converted from 450 ton chiller 2400 tons of ice, or 350 tons of regular cooling, 0.68 kW/ton efficiency, R-123 refrigerant One 400 ton electric centrifugal chiller replaced 450 ton chiller 0.53 kW/ton efficiency, R-123 refrigerant Total of 1950 tons of total cooling capacity, versus 2550 tons previously ice chiller ice tank

11 Marriott Headquarters Free Cooling
Condenser water from cooling towers can bypass the chillers Cooling towers have variable frequency drives Up to 500 tons of cooling provided Used during mild weather in spring and fall

12 Marriott Headquarters Cooling Load Reductions
Replaced magnetic ballasts of fluorescent lighting with electronic ballasts Added tinted films to windows - block sunlight to reduce solar heat gain Complete balancing of air distribution system, including exhaust system EnergyStar printers - used sleep mode to reduce energy use

13 Marriott Headquarters Cooling System Improvements
Just finished adding new motors to air handlers efficiency improved from 87-89% to 94-95% New EMS system Andover 1986 model combined with 1994 model computerized control, and help deciding what systems to run when

14 Marriott Headquarters Project Timeline
New facility management in 1989 Plant clean-up began right away and took 18 months Plant retrofit work began in 1991 Lighting work in 1992 Window work & AHU balancing in 1994 New chillers installed in 1994 1 year of construction New AHU motors added in 1998

15 Marriott Headquarters Financing Structure
Won 1st place ENCOMP award in 1992 for large buildings - got us noticed $1 million from Maryland Public Service Commission through Washington Gas paid for gas absorber $1 million rebate from Pepco replaced one chiller, lighting retrofits, added window films Sold one 450 ton R-123 chiller Saved money by using in-house labor Used almost no cash to finance the project

16 Marriott Headquarters “After” Pictures
boiler room today color coded piping

17 Marriott Headquarters Project Results
Safe, clean, highly efficient plant Remarkable system innovation & flexibility Reduced peak cooling capacity Much improved tenant/building comfort No longer using CFC refrigerants first CFC conversion to R-123 Saving 1.8 MWhrs of electricity per year