ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions, Shopping-Centers, Central-Stations Our Production range Hydraulic steel structures and conveyor systems
2
ThyssenKrupp Linking continents - by train across the Suez Canal The El-Ferdan Bridge, the largest swing bridge in the world Longest swing bridge in the world Breaking span 340 m Swinging weight13,200 tons Opening November 2001
3
ThyssenKrupp River railway bridges Technical Data bridge over the river Rhine Length:274 m Span length:3 x 91.30 m Heigth:20.00 m Steel construction:2,650 tons Construction time:23 months Technical Data bridge over the river Elbe Length:240 m Span length:66.9/105.8/66.9 m Heigth:17.75 m Steel construction:2,700 tons Construction time:8 months
4
ThyssenKrupp River road bridges Over the Askerø-Fjord, Sweden and the river Saale by Beesedau Technical Data Askerø-Fjord, Sweden Length steel bridge:386 m Pylon height::100 m Steel construction:2,191 tons Ropes:313 tons Construction time:8 months Technical Data bridge across the river Saale Length steel bridge:311 m Width of arch:180 m Height of arch:38 m Steel construction:4,400 tons Construction time:31 months
5
ThyssenKrupp The Transrapid – Project in Shanghai We manufactured and supplied points and actuators for the line between Pudong Airport and the Centre of Shanghai.
6
ThyssenKrupp The Transrapid – Project in Shanghai
7
ThyssenKrupp The Transrapid – Project in Shanghai We manufactured and supplied eight switches for the line between Pudong airport and the Shanghai city centre
8
ThyssenKrupp Messe Hannover Conference Center An internationally significant steel construction „made in Hannover“ Technical Data Steel construction:4,500 tons Total length steel construction: 170 m Construction time:13 months European Steel Construction Award 1991
9
ThyssenKrupp Messe Hannover Exhibition hall 8/9 A new dimension in exhibition hall construction Exhibition Hall 8/9, Hannover Length:238 m Width:135 m Covered area:32,000 m² Steel construction:2,400 tons Construction time:12 months Exhibition Hall 6, Düsseldorf Dimensions:165 m x 165 m Primary framework:1,500 tons Space frame + cable subsupport:790 tons Construction time:14 months
10
ThyssenKrupp The „AufSchalke“ Arena (Veltins-Arena) The most modern event centre in Europe Technical data roof construction Free span area:226 m x 186 m Weight fixed roof construction:3,500 tons Weight moving roof panel:560 tons Construction time:10 months
11
ThyssenKrupp The new Soccer Worldcup Stadium for Hannover Modernization of existing Arena for 2006 World Cup Capacity:50,000 spectators New roof with trapezoidal steel and membrane construction Order:September 2002 Completion:September 2004
12
ThyssenKrupp Volkswagen AutoStadt - Vehicle towers Multistorey parking platforms Technical Data Heigth:50 m Diameter:28 m Cars to be stored:400 each tower Glass area:8,800 m² Walled-in space:99,300 m³ Construction time:18 months
13
ThyssenKrupp Materials handling and systems -1 For more than 30 years we have been a relaible and competent partner in the field of internal stock goods handling.
14
ThyssenKrupp Materials handling and systems -2 Power + Free conveyors – sort, collect, store and distribute with one system.