Download presentation
Presentation is loading. Please wait.
Published byJessica Lester Modified over 9 years ago
1
The Tower Bridge
2
The Tower Bridge was built at the request of the population to facilitate the mobility of people and vehicles, and it was in 1876 that the « City of London Corporation" decided to build the london bridge. It took 8 years for 432 workers and 5 builders to build the bridge. The machinery was opened to the public in 1982 as a museum to present the hydraulic operation of the bridge.
3
At the time of its construction, the Tower Bridge was the largest and most sophisticated bascule bridge ever built. This bridge is famous for its unusual architecture: it consists of two towers, a rigid suspension, for the passage of the biggest ships. The construction started in 1886 and was finished in 1894. It’s 286 meters long. Architecture
4
The opening of the bridge Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6
5
The engine room The machinery was opened to the public in 1982 as a museum to present the hydraulic operation of the bridge.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.