Presentation is loading. Please wait.

Presentation is loading. Please wait.

Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012.

Similar presentations


Presentation on theme: "Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012."— Presentation transcript:

1 Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

2 WP3  Info WPL;  OBJECTIVE of WP 3;  ACTIVITIES; –EXPECTED RESULTS AGENDA

3 WP3 Work Package Leader  Claudiu DUTU, –AFDJ Galati – ROMANIA; WPL for next 2 years;

4 WP3 OBJECTIVE for WP3  to find a common approach to harmonise the basic data; –Hydrology; –Hydrography; –Waterway maintenance.

5 WP3 Activities within WP3  Act. 3.1 Common approach regarding water level information & forecasts;  Act. 3.2Harmonisation of shallow section information;  Act. 3.3 Pilot for marking plans

6 WP3 ACT. 3.1 Common approach regarding water level information & forecasts  Report on common Quality of service for water level information;  Report about harmonisation of water level forecast;  Concept for water gauge monitoring;  Concept to improve the national water level information

7 WP3  HU – server for WLI, workstation WLI, network management and UPS WLI;  RO –Danube, automatic tide gauges (2 pieces), soft WLI; –Danube Black Sea Canal – automatic tide gauge stations (2 pieces), soft WLI;  RS – automatic tide gauges stations (2 pieces) Results Act 3.1

8 WP3 Act. 3.2Harmonisation of shallow section information  Status quo report on shallow section information;  Concept for common quality of service for displaying shallow section information;

9 WP3  Agreement about Content and format 1.River bank lines; 2.Limits of the fairway; 3.Signalization… 4.Minimum depths 5.Date of the survey 6.background  Information on FIS Portal…. Results Act. 3.2

10 WP3 Act. 3.3 Pilot for marking plans  Status quo report on current procedures for marking plans;  Concept including technical specification and system architecture for common marking plan database;

11 WP3  RO – ship / shore application MP;  BG – ship / shore application MP;  HR – ship / shore application MP;  RS – server MP + centralized application; Results Act. 3.3

12 WP3 Concept – Master Database

13 WP3 PP - Component

14 WP3 Structure  ship software application –introducing / updating field common elements;  shore software application –collecting / introducing updates liked with centralized server;  Centralized server –synchronizing all common stretch and presenting (web presentation) the signalization status; –Automatic emailing to the skippers / linked to FIS Portal…etc.

15 WP3

16 Thank you for your attention! CLAUDIU DUTU – AFDJ GALATI ROMANIA claudiu.dutu@afdj.ro


Download ppt "Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012."

Similar presentations


Ads by Google