TG Projects status Nikos Houssos euroCRIS Board meeting Bath, 11 February 2011.

Similar presentations


Presentation on theme: "TG Projects status Nikos Houssos euroCRIS Board meeting Bath, 11 February 2011."— Presentation transcript:

1 TG Projects status Nikos Houssos euroCRIS Board meeting Bath, 11 February 2011

2 Running projects ENGAGE EuroRIs-Net+ OpenAIREPlus

3 Report on ENGAGE (1/2) euroCRIS team formed after EoI – allocation of persons to WPs complete 12 persons from 9 countries Adminstrative issues: need to formalise relationship with euroCRIS ENGAGE team members (contract) and decide on details (e.g. payments, formal monitoring of work etc.)

4 Report on ENGAGE (2/2) WP3: Metadata mapping of PSI data standards to CERIF already done WP5: technical development – euroCRIS works with STFC to develop a CERIF-based stack including generation of RDF – Collaboration environment is being setup at EKT – Support needed by WP3 WP4: Evaluation of ENGAGE scenarios – Deliverable due December 2012 – First informal meeting in Bath

5 Report on EuroRIs-Net+ Subcontracting work officially assigned by the NHRF Board to euroCRIS Ensuring EuroRIs-Net+ data model is CERIF compliant 12 months (probably starting March 2012) – 15.000 Euros Need to allocate work within euroCRIS

6 Report on OpenAIREPlus Proposal for mapping the OpenAIRE data model to CERIF compiled and sent to CNR (Paolo Manghi) Two teleconferences held between euroCRIS and EKT/euroCRIS OpenAIREPlus to support CERIF import/export and probably some parts of the model natively Discussions in progress – decisions to be made spring 2012 Administrative procedures to be done by EKT

7 Accepted projects Two JISC projects from the last call UK-RISS (UK Research Information Shared Services). Lead institution: King's College London. DESCRIBE (Definition, Evidence, and Structure to Capture Research Impact andBEnefits. Lead institution: University of Exeter.

8 Submitted proposals PERICLES – ICT Call 6 – euroCRIS is the coordinator – landmark project for euroCRIS if successful EXEDRA – INFRA-2012-1.1.3. Research infrastructures for archaeological datasets and related technologies – Coordinated by the University of Oxford – EKT subcontracts euroCRIS for applying CERIF to capture context in archaeology research activities. – Results expected in February/March

9 Proposals in preparation PRODROME proposal prepared for the current open Science in Society Call Topic SIS.2012.1.3.3-1: Scientific data: open access, dissemination, preservation and use Coordinated by INTRASOFT International ENGAGE core of partners, including euroCRIS and STFC

10 Further opportunities ICT PSP Call 6 – Deadline: 15 May 2012 Objective 2.2b: Open Data and open access to scientific information – Only Pilot B: co-financing is an issue - personnel costs are 50% funded by EC Objective 2.2c: Legal aspects of PSI and standards for open data – Two thematic networks – Probably go for the “Standards for open data” with the ENGAGE partners?


Download ppt "TG Projects status Nikos Houssos euroCRIS Board meeting Bath, 11 February 2011."