1
VELO Status at Liverpool T. Bowcock
2
Prototype Module(1) Mechanical Design Several different options Reduce complexity Dead reckoning
3
Prototype Module(2) Similar to TDR Pipe slides through paddle
4
Prototype Module(3) Single (asymmetric) Cooling Pipe
5
Prototype Module(4) Base simplified(?) Production in CF
6
Prototype Module(5) Invar CTE CHE coating
7
Prototype Module Schedule Mechanical Module(2-4 weeks) Two separate bases Paddles(2) Substrates(4-6) Bonding SCTa Hybrids to Substrates Measurements Alignment of two sides NAS, JC jig and location facility Thermal Tests
8
Cooling System(1) Complete awaiting safety clearance !!!
9
Cooling System(2) Safety compliant (factor 10!) certified Leak tested CO 2 monitor
10
Glues Investigate glue additives Better thermal properties Carbon Nanotubes(multiwall 20micron) Boron Nitride(1micron ceramic) Control resistivity Easily achieve >2WmK Boron Nitride Ceramic mix and leakage current (MPI) Test 3 micron size
11
Funding for Prototyping Despite recent funding crisis are able to buy (at least) one full prototype run that is non Micron. CIS have made offer(GLC) Delivery schedule p-spray technology for n + n Mask set from CIS Finalize the details – preproduction Review of r.f. foil