Download presentation
Presentation is loading. Please wait.
Published byDanielle Castillo Modified over 10 years ago
1
26 June 2001VELO-Overview VELO Overview T. Bowcock University of Liverpool
2
26 June 2001VELO-Overview Post-TDR Hardware Software Critical Issues Summary
3
26 June 2001VELO-Overview Hardware Sensors Hybrids Thermo-Mechanical Module Testbeam Production Facilities
4
26 June 2001VELO-Overview Hardware: Sensors (1) Two types of sensors produced –Hamamatsu (n+n)- 1998 –Micron (p+n)2000 In fabrication (mask design at Lpool) –Micron (n+n)2001
5
26 June 2001VELO-Overview Hardware: Sensors (2) Laboratory –High precision tests with 1060nm lasers for both sets of detectors (LHCb note) Testbeam at CERN –Under preparation for 2001
6
26 June 2001VELO-Overview
7
26 June 2001VELO-Overview
8
26 June 2001VELO-Overview
9
26 June 2001VELO-Overview
10
26 June 2001VELO-Overview Hardware: Sensors (3) Additional test equipment –Cosmic ray facility – now commissioned Shorter wavelength laser (900nm) –Ordered Automated Scanning x-y stage
11
26 June 2001VELO-Overview Hardware: Sensors (4) Simulation complete –First principle analysis of leakage currents and charge collection as a function voltage Agreement with data –Note low voltage phenomena <20V Q/I amplifiers.
12
26 June 2001VELO-Overview Hardware: Sensors (5) Identify manufactures for Production –Hamamatsu (withdrawn n+n option) –Micron (n+n, p+n) –CSEM, Eurysis, SEIKO, SINTEF, ST Technical discussions Price Enquiry
13
26 June 2001VELO-Overview Hardware: Hybrids(1) Hybrid Design&Production to IDE –Delivered –Bonded and mounted with chips –Fan-ins produced –Under test 4 chips r/o (26/6)
14
26 June 2001VELO-Overview Hardware: Hybrids(2) Kapton version to be ordered early 7/01 SCT-VELO design (Liverpool) –improved cable connections –Viable pre-production prototype Beetle design
15
26 June 2001VELO-Overview Hardware: Module(1) Thermal models for TDR Cooling system –Safety issues addressed
16
26 June 2001VELO-Overview
17
26 June 2001VELO-Overview
18
26 June 2001VELO-Overview Power Delta(T) (from nominal) Calibration Model
19
26 June 2001VELO-Overview Chip glue kapton sensor ceramic TPG Chip glue kapton sensor TPG CF weave CF(UD)
20
26 June 2001VELO-Overview
21
26 June 2001VELO-Overview Hardware: Module (2) Prototype and testing of adjustment Re-engineering –Carbon fibre base –O CTE materials including adjustment screws
22
26 June 2001VELO-Overview Electronics Cooling Bracket & Fixings Carbon Fiber Paddle Micrometer Adjusters Paddle Base Flat Spring Location Base Substrates Silicon Detectors x y y z z x (pitch) (roll) (slew)
23
26 June 2001VELO-Overview
24
26 June 2001VELO-Overview
25
26 June 2001VELO-Overview
26
26 June 2001VELO-Overview Hardware: Module (3) Curvature of the sensors measured We may need to survey (cold?) the modules
27
26 June 2001VELO-Overview Hardware: Module (4) Measurement points
28
26 June 2001VELO-Overview
29
26 June 2001VELO-Overview
30
26 June 2001VELO-Overview Hardware: Testbeam Module for October 2001 –See also software
31
26 June 2001VELO-Overview Hardware: Production Facilities Clean rooms Bonding equipment Jigs and Assembly –Vacuum compatible glue dispensing
32
26 June 2001VELO-Overview Production Facilities LHCb R&D
33
26 June 2001VELO-Overview
34
26 June 2001VELO-Overview Software TDR analysis and optimisation Monte Carlo simulations of VELO VELO core software (meeting 5/6 July) Alignment Testbeam
35
26 June 2001VELO-Overview Software: Optimisation We generated and analysed over 10m bb events generated and analysed for different configurations: Physics Section Optimisation paper (for TDR) huge effort impossible without substantial effort
36
26 June 2001VELO-Overview Software: Silicon Other (non GEANT software) for optimisation of operating conditions
37
26 June 2001VELO-Overview
38
26 June 2001VELO-Overview
39
26 June 2001VELO-Overview
40
26 June 2001VELO-Overview
41
26 June 2001VELO-Overview
42
26 June 2001VELO-Overview Software: Alignment(1) Alignment: Underway –From HERA code used by H1 –Fast determination of global parameters –Reduced to linear problem
43
26 June 2001VELO-Overview Software: Alignment(2) Curvature of detectors
44
26 June 2001VELO-Overview Residuals
45
26 June 2001VELO-Overview Software: Other LHCb production LHCb Grid –Testbeam as testbed
46
26 June 2001VELO-Overview Critical Issues Electronics Manufacturers for Silicon Grid
47
26 June 2001VELO-Overview Summary Sensors Hybrid Module Software
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.