Download presentation
Presentation is loading. Please wait.
Published byMadeline Lyons Modified over 9 years ago
1
2013 Agile Conference Need 4 Speed Leverage new metrics to boost your velocity without compromising on quality
2
Introduction The Challenges The ALI Concept Using The ALI Model Outline
3
Over 3000 developers globally distributed. An average project size is ~100 developers. Hewlett Packard (HP)
4
In this project involved over 150 developers, QA and PO distributed in Israel, Ukraine, Czech, Vietnam, China and the US. Agile project management solution
5
Collaboration Time zones Velocity Dependencies & Defect resolution Quality From 18-24 month releases to 2 weeks release Readiness of Value Delivery Chain (VDC) Not enough time The Challenges
6
The idea is the extraction of information stored in various tools and leverage a complete end to end traceability to compile new metrics and reports. The ALI Concept
7
Theme, Feature, User Story Source code files and lines of code Unit test, Functional tests, Static code analysis test, performance test, security scan Builds and deployments Defects Practitioners Entities
8
Source Code Management (SCM) Build System and Continuous Integration tools Unit test tools, Static Code Analysis and Functional testing tools Code coverage tools Integrated Development Environment tools (IDE) Agile project management and issues tracking tools Tools
9
Line of Code (LOC) per user story Number of Files (NOF) per user story Number of developers\contributors (NOC) per feature\theme. Unit test coverage per user story Unit Test success per user story No of defects per user story Metrics
10
Build Reports Build reports composed of the metrics
11
Build Trends Build trends report show trends on 1. Number of outstanding defect 2. Volume of changes per user stories vs. defects. 3. Top contributors – based on LOC 4. Percentage of build success vs. failures
12
Heat map The report maps the application based on the structure of code in the Source Code repository.
13
The report list following related entities and activities per defect 1. Related user stories 2. Tests 3. Latest code changes related to the user stories Root cause analysis report
14
Dev Manager Quality Assurance Developers Operations Marketing Using The ALI Model
15
It shares the additional analytics and metrics that allowed HP to enable cross time zones collaboration and alignment through transparency and provides insights into quality and risk. Conclusion
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.