Download presentation
Presentation is loading. Please wait.
Published byEvangeline Dawson Modified over 9 years ago
1
presented by: Brian Harvey Quality Manager – Clamonta Ltd a small business perspective & 9103 presented to: IAQG
3
agenda morning presentation –how a small business implemented 9103 afternoon break out session –9102 FAI process improvement software presented by: Brian Harvey
4
located:Nuneaton, Warwickshire, UK employees:45 sales:£4.25 million established:1960 manufactures:components & assemblies approvals:9100 & NADCAP
5
continuous improvement strategy process improvement charting kaizenEFQM5s
6
9103 barriers 1.middle management 2.cost/benefit 3.communication 4.training 5.data collection method 6.product type
7
?
8
process improvement charts: individuals X UCLx LCLx 1.measurement data 2.equipment 3.batch/job number 4.date & time 5.location 1. text message or e-mail to process owner 2. cause & corrective action from chart owner discovering the truth about our processes and training our people at the same time
9
Real Time Process Improvement
10
facilities layout office turn cell mill cell grind cell ndt lock plate cell heat treat runners repeater & strangers
11
repeater & strangers
13
300 parts/ month batch sizes 1 to 24 off repeat 1 to 5 years
14
January 2003
15
September 2003
16
repeaters & strangers results failure appraisal prevention failure appraisal prevention quality costs before after 1 person running 2 CNC lathes 3 month trial 40 parts numbers 4000+ measurements 4 non-conforming parts WITH 4 people running 8 CNC lathes average 40 part numbers each 200+ non-conforming parts WITHOUT
17
runners
18
55 part numbers 65000 parts / year batch sizes 100+ repeat 1 to 4 months
19
Cpk improvements milling fixtures problems < 1.33 Cpk our team solved that problem now >1.66 Cpk
20
(parts per million)
21
runners ‘cell’ results in <5 years <½ resource 35% more product in-process inspection only zero delivered non-conformance <£4K internal scrap (£950K turnover)
22
9103 savings 1.reduced non-conformance 2.improved root cause problem resolution 3.increased efficiency 4.improved flow
23
Clamonta Ltd Whitacre Road Nuneaton Warwickshire CV11 6BX United Kingdom Tel:+44 (0) 24 76382447 / 76370307 Fax:+44 (0) 24 76381312 brian.harvey@clamonta.co.uk www.clamonta.co.uk thank you hand over to Delta - Dave Wentworth
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.