Download presentation
Presentation is loading. Please wait.
Published byJoleen Welch Modified over 9 years ago
1
Luxembourg January 20121 CORE ESSnet (COmmon Reference Environment) final meeting Carlo Vaccari Istat - Italy
2
Luxembourg January 20122 Outline CORE WPs and main results Meeting Agenda Future?
3
Luxembourg January 20123 CORA project Main results: Survey on existing software → SAB repository Architecture: – Two dimensions – Layered – Platform independent – GSBPM compliant Prototypes
4
Luxembourg January 20124 CORE workpackages WP1: Project management WP2: Design of the information model WP3: Generic interface design for interconnecting sub- processes WP4: Workflow solutions for process management WP5: Generic interface and scenario for.NET WP6: Generic interface and scenario for Java WP7: Project dissemination and cost reporting
5
Luxembourg January 20125 Meetings Meetings held: Kick-off - Luxembourg 17-18 January 2011 Lisbon meeting – 28-29 March 2011 Paris meeting – 20-21 June 2011 Rome meeting - 3-4 October 2011 Final meeting in Luxembourg - 11-12 January 2012 workshop to present CORE results to Eurostat
6
Luxembourg January 20126 Workpackages dependencies
7
Luxembourg January 20127 CORE WP2 Information model (del 2.2) for the statistical process designed in accordance with these principles: Rectangular data sets: rows and columns Strong typing: each column one value type only and so a data set is (strongly) typed. Also rules and parameters are typed Data set Kinds: a type of channel, constrain the data sets that can be transferred (micro data, dimensional, classifications,...) Free-style arguments: like scripts Business objects: support to XML to model business objects outside CORE, such as the GSIM CORA requirements met by the m odel
8
Luxembourg January 20128 CORE WP3 Architecture: unique environment for: Designing Statistical processes in terms of abstract services Exchanged data and metadata Running Designed processes by invoking wrapped tools
9
Luxembourg January 20129 CORE WP3 CORE Data: Domain descriptor: meta-model with entities and entity properties CORE data model: Rectangular data set - Data set kind - Column kind Mapping model: mapping data to Domain Descriptor Integration API: making a tool a CORE service, translating inputs and outputs of the tool in a completely transparent and automatic way
10
Luxembourg January 201210 CORE WP4 Most important result: workflow tools evaluation Comparison based on these different axes: – Modeling : g raphical interface, model translation – Integration: communication technology, standards, user management, versioning, process repository, event driven work-flow, rules engine – Execution: monitoring, traceability – General : usability, manual/automatic steps, long running transaction
11
Luxembourg January 201211 CORE WP5 and WP6 These WPs provide a working solution that permits the automatic execution of selected GSBPM sub-processes starting from WP3 results WP5 provides an implementation in.NET while WP6 provides an implementation in Java. In the afternoon DEMO for two environments
12
Luxembourg January 201212 WP7: dissemination Web site and many presentations: NTTS Brussels 22-24 February 2011: Istat MSIS Luxembourg 23 – 25 May 2011: Istat MeTTeg Camerino Italy 30 June – 1 July 2011: Istat SISAI Luxembourg 7 – 8 June: Istat Meeting organized by Senior Statistician of the Statistical Service of Greece, Crete July: UoA Working group for "Technology innovation" organized by the General Secretariat of Research&Technology, Greece, September: UoA METIS workshop Geneva 5 – 7 October 2011: CBS & SSB ITDG Luxembourg 18 – 19 October 2011: Istat ESSnet workshop Cologne, Germany 27 – 28 October: SSB HLG-BAS workshop Geneva 31 October – 1 November: Istat
13
Luxembourg January 201213 CORE WP7 - Costs Collection from Implementation library for Generic interface (WP3) and integration for the subprocesses in.NET (WP5) & Java (WP6) Integration Cost Reporting Categories to use: a) Data conversion, b) Service embedding and c) Integration API. Note that these three categories include time spent on design, build and test.
14
Luxembourg January 201214 Final meeting Agenda 9.30 – 10.00Opening (Eurostat) 10.00 – 10.30CORE Project Introduction (Istat) 10.30 –11.15CORE Model (CBS) 11.15 – 12.00CORE Architecture (Istat) 12.00 –12.45Workflow Solutions (Insee) 12.45 – 14.00Lunch Break 14.00 –15.30DEMO Session (Istat and CBS) 15.30 – 16.30Open Discussion & Conclusions
15
Luxembourg January 201215 Final remarks Rich results in 13 months: requirements → general model → software Importance of work atmosphere Good cooperation between countries Big advancements in meetings: importance of presence → new tools like teleconference? Good cooperation with other groups: SAB, GSIM, HLG, MSIS Competences, skills and tools to be preserved Need sponsorship inside NSIs, in Eurostat and in other groups
16
Luxembourg January 201216 Future? CORE next steps: – environment tested in NSIs → generate requirements → implementation (industrialization) – Eurostat sponsorhip → industrialization → adoption Connections outside CORE: – HLG-BAS: more cooperation needed (sprints and...) – Mutual review with OCMINF on GSIM – SDMX integration (SDMX deliverable) – Support to SAB repository developments
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.