Download presentation
Presentation is loading. Please wait.
Published byEugene Turner Modified over 9 years ago
1
Channel Partner Conference 2013 Yarra Valley Advanced Manufacturing System ABM Annual Channel Partner Conference 2013
2
Channel Partner Conference 2013 Yarra Valley AMS/ABM Integration Recently updated to include Warehousing module (5.0.10) ABM 8 includes direct access to Bill of Materials List Production Runs List Simple Production Processing Sales Order Integration
3
Channel Partner Conference 2013 Yarra Valley Production Issues Screen Warehouse bin selection now available within the grid if warehousing is detected. Also “Multi-Select Bins” button available if goods need to be issued from several bins at once.
4
Channel Partner Conference 2013 Yarra Valley Receipt Products Bin Number now available for putting manufactured products into a bin directly. Serial/Lot Tracking is fully supported in conjunction with warehousing as well, for both issuing materials and receipting product.
5
Channel Partner Conference 2013 Yarra Valley ABM Integration Manufacturing section now visible if AMS is installed. Active production runs listed Bill of Materials listed
6
Channel Partner Conference 2013 Yarra Valley ABM Integration Direct Drilldown to Production Run Maintenance Full features available
7
Channel Partner Conference 2013 Yarra Valley ABM Integration Direct drilldown to Bills of Material Maintenance as well.
8
Channel Partner Conference 2013 Yarra Valley ABM Integration – From Sales Order
9
Channel Partner Conference 2013 Yarra Valley ABM Integration – To Production
10
Channel Partner Conference 2013 Yarra Valley
11
More to come… Access to more AMS features MRP Job Entry Capacity Planning
12
Channel Partner Conference 2013 Yarra Valley AMS User Licences Viewing the lists in ABM doesn’t count as an AMS user Drilling down into an AMS screen will count as an AMS user until the user logs out of ABM.
13
Channel Partner Conference 2013 Yarra Valley AMS 6.0 User Interface Updated Workflow efficiency improvements Reports Engine updated Favourites and recently run lists Reports freshened up
14
Channel Partner Conference 2013 Yarra Valley AMS 6.0 Capacity Planning Improvements Work centre routings Dependant stages Minor MRP Improvements Suggested production run rescheduling Improved production confirmation
15
Channel Partner Conference 2013 Yarra Valley AMS Platforms Applications for tablets can be done Browser-based options Ask.
16
Channel Partner Conference 2013 Yarra Valley Timesheets Web version available for beta sites. Will migrate away from IIS
17
Channel Partner Conference 2013 Yarra Valley Web Timesheets Beta 50% off list price Release Following sufficient beta testing Full price Installation packages available
18
Channel Partner Conference 2013 Yarra Valley Mobile Timesheets Using ABM Application Server framework Thin-client, platform-specific technology Terminal Server licences not required No change to TMS licence model (modules + staff) View and update job details Simple timesheet collection Geo-location recording with timesheet entries
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.