Download presentation
Presentation is loading. Please wait.
Published byLydia Beasley Modified over 9 years ago
1
www.FrontRoyalPlan.com FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life that is not in community. - T.S. Eliot 1 Confluence [kon-floo- uh ns] noun 4. A coming together of people or things; concourse
2
Community Design: Respect and Care for our Natural Environment. 2 4 Communities – situated around the sites natural features and drainage systems to minimize future impacts on the watershed and to utilize these areas as future recreation and open space amenities.
3
Community Life: Respect and Care for Existing and Future Residents Community Need: New elementary school site 2015+ and regional park facilities. Proposed 56 acre land dedication for future school sites and park and additional 20 acre park site. Community Historical Resource: Preserve the historic Marshall family cemetery and surrounding lands. $9,000,000 in contributions to the Town W&S infrastructure and over 4.6 million dollars to the W.C. School system. Walking/ Hiking/ Biking Trail network along E-W and throughout the Community connecting new residents with existing residents and downtown business’. 3
4
Community Life: Community Transportation Needs Transportation network capacity improvements serving the Happy Creek Technology Park in the Town’s North East and H.C. Road area. The East-West Connector Road is a long planned and vital link in the local transportation network, and will help facilitate Economic Development in the adjacent H.C. Technology Partk. The East-West Connector will also provide a long needed second means of ingress/egress to the folks living in Shenandoah River Estates and Shenandoah Shores. 4
5
Confluence Virginia - Community Respecting our past, planning for the future, and preserving our quality of life and natural resources for future generations. 5 The FRLP proposal would cause the construction of the entire E-W Connector Road in the first phase of the project – at NO cost to existing taxpayers …and ensure the future construction of a full 4 lane facility crossing of the railroad tracks and connection to 8 th street and Commerce Avenue – at NO cost to existing taxpayers.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.