Department of Public WorksDepartment of Public Works Performance Measures 2010
2
Roads and SidewalksRoads and Sidewalks
3
Bridges, Dams and CulvertsBridges, Dams and Culverts
4
Storm Drains and Catch BasinsStorm Drains and Catch Basins
5
Sanitary SewersSanitary Sewers
6
Traffic Signs, Signals and MarkingsTraffic Signs, Signals and Markings
7
Municipal Parking LotsMunicipal Parking Lots
8
Buildings and GroundsBuildings and Grounds
9
Solid Waste and RecyclingSolid Waste and Recycling
10
Snow and Ice ControlSnow and Ice Control
11
DPW Responsibilities cont’dDPW Responsibilities cont’d Parking Enforcement Equipment Maintenance Construction
12
Assistant Director Supervisor of Highways Senior Equip Operator Mason/Equip Operator Laborer Driver II Parking Crew Leader Parking Ranger Scaleman Recycling Attendant Supervisor of Facilities & Equipment Head Custodian Custodians Sewer System Foreman Sewer System Mechanic Sewer System Operator Mechanic II Maintainer (P.T) Engineering Aid Administrative SecretarySewer Services Clerk
13
Historical Service RequestsHistorical Service Requests
14
Work Requests By Type FY 09
15
Cleaning Catch Basins Street SweepingCleaning Catch Basins Street Sweeping Total number of CB’s- 1175 Total Curb Miles – 162 Objectives: Objective: Inspect and clean all CB’s as needed.yearly. Sweep all streets by May 15 Inspect and clean all CB’s as needed.yearly. Sweep all streets by May 15 Inspect and clean CB’s in flood-prone Inspect and clean CB’s in flood-prone areas before each major rainfall Note: FY 09 is thru 12/31/08
16
Street ResurfacingStreet Resurfacing FY 2006 -2.5 miles at $111,000 per mile FY 2007 -2.2 miles at $130,000 per mile FY 2008 3.4 miles in at a cost of $135,000 per mile FY 2009 2.9 miles in at a cost of $194,000 per mile FY 2010 1.9 miles in at a cost of $188,000 per mile
17
Total Miles ResurfacedTotal Miles Resurfaced
18
Historical Asphalt PricesHistorical Asphalt Prices
19
Value of Construction Projects thousands of dollars Value of Construction Projects thousands of dollars
20
Sanitary Sewer CustomersSanitary Sewer Customers
21
Sewer Operating Results Note: FY 10 projected
22
Paid to Stamford/Operating Revenue Note: FY 10 estimated
23
Parking Tickets IssuedParking Tickets Issued
24
Parking Ticket RevenueParking Ticket Revenue
25
Solid Waste and RecyclingSolid Waste and Recycling
26
Darien MSWDarien MSW
27
HHW Day ParticipantsHHW Day Participants
28
Cost of Household Hazardous Waste DisposalCost of Household Hazardous Waste Disposal
29
tIhe rest of your Saturday I’m done. Try to enjoy the rest of the day.
30
Department of Public WorksDepartment of Public Works Performance Measures 2010
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.