WCMS Report Web Advisory Committee April 2010
2
Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements –In Phase 1 and Phase 2 to develop Uwaterloo Main site;
3
Schedule April Meeting w/ other universities using Drupal Obtaining additional Drupal knowledge via conference Developing rapid prototypes to learn about Drupal
4
Schedule May Define and implement hardware (system architecture) to run Drupal Finalize web design functional requirements specifications (with Redesign Team)
5
Schedule May Define the scope for –Pilot website 1 - Phase 1 (Housing) –Pilot website 2 - Phase 1 (Web resources) –Pilot website 3 - Phase 1 (UWaterloo main) Perform thorough review of CMS requirements
6
Schedule June – September Define Drupal configuration Develop Pilot website 1 (Housing) - Phase 1
7
Schedule September 2010 Develop Pilot website 2 (Web resources) - Phase 1
8
Schedule October 2010 Develop Pilot website 3 (UWaterloo main) - Phase 1
9
Schedule November 2010 Develop Pilot website 3 (UWaterloo main) - Phase 2
10
Schedule December 2010 Develop Pilot website 1 (Housing) - Phase 2
11
Schedule January 2010 Develop Pilot website 2 (Web resources) - Phase 2
12
Notes Web Resources site chosen as pilot b/c site will provide CMS and Design Resources for the project
13
Notes Housing chosen as pilot b/c of staff on the team and b/c well-defined existing website with manageable scope
14
Notes Starting with Housing, then Web Resources and UW Main in Phase 1 Reversing the order in Phase 2 Pilot because of time pressures to get site out
15
Notes Faculty rollout and other-sites rollout TBD –phased faculty rollout expected; –sometime after January 2011;