Download presentation
Presentation is loading. Please wait.
Published byRolf Stokes Modified over 9 years ago
1
Brandon Abel – Human Factors zFebruary 13, 2001 – Preliminary Design Review zPressurization System zWater System zIn-Situ propellant/Fuel Cell zConsumables zMission Comparison zCost/Risk Assessment zFuture
2
Pressurization System zCabin at 14.7 psia z80% Nitrogen z20% Oxygen zShuttle and Space Station z 4 Oxygen/4 Nitrogen Tanks z Oxygen Tanks - Mass(O2) = 256 kg - Mass = 75 kg - Vol. = 1.14 m^3 Nitrogen Tanks
3
Water Tanks zRadius = 0.32 m zLength = 2.64 m zMass = 100 kg z4 for hygiene water z2 for potable water
4
In-Situ Propellant Production /Fuel Cell Back-Up zIn-Situ Propellant Production zUsed as a back-up for oxygen and water for stay on Mars and return trip to Earth z Fuel Cell System z No back-up planned
5
Mass/Volumes
6
Free Return versus Direct zFor a mission of 5 crew members z640 days consumables on Hab for exact same mass and volume zTherefore, 342 days needed for ERV zThis would require 1444 more kg of consumables for the ERV
7
Cost Assessment /Risk Assessment zCost Assessment zAir/Water based on shuttle system designs zNew equipment needed to be built zFilter Systems need designed z Risk Assessment z Proven designs z Pressurization system z Water tanks z In-Situ back-up z ERV back-up
8
Future Works zMedical equipment zLower requirements zPower inputs zMission Comparison
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.